12 Miss. Code. R. 3-2.1-1-01500-1.01 - DESCRIPTION

A. Scope: Work required under this section consists of all temporary construction facilities, services and related items to complete the work indicated on the drawings and described in the Project Manual.
B. Standards:
1. Conform to or exceed all temporary construction requirements stated in the current edition of the Standard Building Code [Chapter entitled Safeguards During Construction].
2. Refer to Article 10.1.1 in Section 00700 entitled General Conditions.
C. Materials: All materials required by the Work of this section shall be as specified in the respective sections.

Notes

12 Miss. Code. R. 3-2.1-1-01500-1.01

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.