The Project Manual will be prepared based on the
Construction Specification Institute format.
Division 00 and 01 of the CSI entitled
Procurement and Contracting Requirements and General
Requirements respectively, are furnished by the Bureau for Bureau
administered projects and are to be reproduced as is into the
Project Manual. Any additions made by the Professional will be included in the
section entitled Division One Supplement. Any modifications
other than these made by the Professional, shall be subject to approval of the
Bureau, and will be included in the Division One Supplement or
by Addendum only. For projects not administered by the Bureau, use of Bureau
Division 00 and 01 template documents is strongly encouraged, but not required.
All other sections of the specifications shall be as provided by the
Professional and shall be written so as not to exclude comparable equipment of
domestic manufacture. Products shall generally be specified in one of five
methods:
1. Specification by reference
standards or technical performance requirements only. Contractor shall have the
option to select any product meeting product standards by any Manufacturer.
Professional shall identify critical performance and/or technical details
necessary to meet project requirements, but shall not do so in a
hyper-technical manner so as to place unnecessary or inconsequential
restrictions on providers of otherwise comparable equipment. Further, when
utilizing specifications of this nature, Professionals are expected to be
certain that such specifications can reasonably be met by more than one
product.
2. Specification by naming
a minimum of two (2) or three (3) products or Manufacturers or equal.
Contractor shall have the option to select any product and Manufacturer named.
Additionally, Contractor may always submit any product and Manufacturer meeting
all product standards as an equal.
3. Specification by "basis of design".
Contractor may select any equivalent product meeting specified reference
standards or technical performance requirements as represented by the named
products and/or Manufacturers. Professional shall identify critical performance
and/or technical details necessary to meet project requirements, but shall not
do so in a hyper-technical manner so as to place unnecessary or inconsequential
restrictions on providers of otherwise comparable equipment. Further, when
utilizing specifications of this nature, Professionals are expected to be
certain that such specifications can reasonably be met by more than one
product.
4. Specification as "brand
specific". Contractor may only utilize specified product. Prior approval by the
Director of the Bureau of Building, Grounds and Real Property Management is
required. Professional may only utilize this method when justified due to the
nature of specific project requirements. Professional shall furnish written
justification for review and approval including the following:
a. Description of the product for which
approval is being sought
b.
Explanation of why the product is the only one that can meet project
requirements
c. Estimate of cost for
such product
d. Estimate of cost for
overall procurement
e. Availability
of the product to bidders and/or subcontractors
5. Specification as "sole source". Contractor
may only utilize specified product, which is available from only one source.
Professional may only utilize this method when justified due to the nature of
specific project requirements. Such specification may only be utilized in
sole-source procurements and shall not be embedded within request for
quotation, allowance, request for bid, or request for proposal solicitations.
Professional shall furnish written justification for review and approval
including the following:
a. Description of
the product for which approval is being sought
b. Explanation of why the product is the only
one that can meet project requirements
c. Explanation of why the source is the only
person or entity that can provide the required product
d. Explanation of why the amount to be
expended for the product is reasonable
e. The efforts expended to obtain the best
possible price for the product
6. Products proposed to be procured via sole
source shall be advertised in the same manner provided in Section
31-7-13(c),
Mississippi Code, Annotated. Such advertisement shall direct vendors to the
procurement portal website where Bureau shall publish for a minimum of fourteen
(14) days the terms of the proposed sole source procurement including the above
items as well as procedures for any person or entity that objects and proposes
that the product published on the procurement portal is not sole source and can
be provided by another person or entity. If no objection is received, Bureau
will obtain approval from the Public Procurement Review Board and document
compliance with process via General Standard Approval Form.
7. Where sole source procurement is objected
to, the Bureau will follow the following steps:
a. If the Bureau determines after review that
the product in the proposed sole source request can be provided by another
person or entity, the sole source request will be terminated and such product
procured in a competitive procurement process.
b. If the Bureau determines after review that
there is only one (1) source for the required product, then the Bureau may
appeal to the Public Procurement Review Board. The Bureau shall have the burden
of proving that the product is only provided by one (1) source. If appeal is
successful, Bureau will proceed with procurement and document compliance with
process via General Standard Approval Form.
c. If the Public Procurement Review Board has
any reasonable doubt as to whether the product can only be provided by one (1)
source, then the Bureau will procure the product in a competitive procurement
process.
8. Prior
approval of brand specific specifications for projects not administered by the
Bureau shall be the same as hereinbefore stated with the exception of such
prior approval may be granted by the board of a governing authority and where
such justification is placed on the minutes of the governing
authority.
9. Procedure for use of
sole source specifications for projects not administered by the Bureau shall be
the same as hereinbefore stated. An exception of such approval may be granted
by the board of a governing authority where such authorization is placed on the
minutes of the body at the next regular meeting thereafter. Following such
purchase, the executive head of the state agency, or his designees, shall file
with the Department of Finance and Administration, documentation of the
purchase as noted in 5a thru 5e above.