12 Miss. Code. R. 3-20-600.6 - PROGRAM EXAMPLE
The following page gives an excellent exampleof various aspects included in a Program phase:
1.0
DOCUMENT PLANNING SITUATION,
PROJECT OBJECTIVES, LOCATION AND SCOPE
1.1 Describe conditions leading to need for
this two-phase capital renovation project; document existing facilities and
project sites, in terms of space available and condition.
1.2 Outline project purpose, design
objectives, and proposed occupants. Provide overview of affected administrative
functions.
1.3 Define project scope
inclusive of size (e.g. renovation area, additional floor area, etc.) and
anticipated design, construction and occupancy schedule.
1.4 Defined required interim use of other
facilities during the primary renovation.
2.0
DEFINE PROJECT RATIONALE, ANALYZE
FUNCTIONAL REQUIREMENTS AND DETERMINE SPACE ALLOCATIONS
2.1 State program and design goals for the
proposed project.
2.2 Analyze
administrative and functional requirements; define facility and site
issues.
2.3 Present staff and other
relevant statistical data in support of project need/rationale.
2.4 Determine administrative space
requirements for: administrative service areas, open space work areas, group
offices, private offices, meetings rooms, and office support facilities, as
well as for all other project functions such as ceremonial spaces in the
primary building to be renovated.
2.5 Develop listing of spaces to be provided
in the renovated facilities.
2.6
Utilize comparative office space standards for the Using Agency, State
Government, and other entities.
3.0
PREPARE DETAILED DESCRIPTIONS OF
THE SPACES TO BE PROVIDED
3.1 Provide
detailed descriptions of each space:
a. Name,
function, and type of space
b.
Approximate size (NASF)
c. HEGIS
space code designation
d. Special
design considerations
e. Functional
relationships between spaces
3.2 Provide graphic illustrations of desired
relationships among all major spaces of the project.
4.0
DEFINE DESIGN CRITERIA AND SPECIFIC
PROJECT CONSIDERATIONS
4.1 Prepare
listing of general architectural design considerations for the project,
including standard items specified by the Using Agency.
4.2 Prepare statement of special design
considerations, including site issues that are unique to this project:
a. Project sequencing and schedule
constraints
b. Required
demolition
c. Project
limits
d. Energy goals
e. Landscaping or site development
requirements
f. Special utility
requirements/interfaces
5.0
PROVIDE LIMITED STAFF TIME FOR
PROJECT REVIEWS AND REVISIONS
5.1
Submit program document to the Bureau of Building, Grounds and Real Property
Management and the Using Agency for reviews and revisions prior to general
distribution.
5.2 Reserve two (2)
work days for attendance/participation in review meetings and for accomplishing
necessary document revisions at each of the two progress
milestones.