12 Miss. Code. R. 6-3.113.02.1 - Standards

Factors to be considered in determining whether the standard of responsibility has been met include whether a prospective contractor has:

(1) Available the appropriate financial, material, equipment, facility, and personnel resources and expertise, or the ability to obtain them, necessary to indicate its capability to meet all contractual requirements;
(2) A satisfactory record of performance;
(3) A satisfactory record of integrity;
(4) Qualified legally to contract with the State; and
(5) Supplied all necessary information in connection with the inquiry concerning responsibility.

Notes

12 Miss. Code. R. 6-3.113.02.1
Adopted 1/1/2018

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.