19 Miss. Code. R. 8-1.28 - Plan Review - New Equipment
(1) A contractor
must submit for review an application and plans for the installation of new
equipment.
(2) To apply for a plan
review for the installation of new equipment, a contractor must:
(a) submit a completed application on a
department-approved form;
(b) pay
the fee required by this Regulation; and
(c) submit layout drawings as specified in
this Regulation for the specific type of equipment to be installed. These
layout drawings shall also include:
(i) the
rated speed of the equipment in feet per minute;
(ii) the rated capacity of the equipment in
pound;
(iii) the total travel of
the equipment in feet and inches;
(iv) elevation drawings of the hoistway,
runway, or wellway; and
(v) plan
drawings indicating the arrangement of the equipment in a machine room, machine
space, control room, or control space.