1. Remove all
cellulose bearing debris such as scrap wood, wood chips, paper, stumps, dead
roots, etc., from underneath buildings. Large stumps or roots that are too
sound to be removed may be trenched, drilled or rodded and treated provided
they are six inches or more from foundation timbers.
2. Remove all wooden contacts between
building and soil, both inside and outside. Wooden supports under buildings
must rest on a concrete footing, a brick capped with concrete, or other non
cellulose materials. The top of the brick or footing should not be less than
six inches above the ground. This includes but is not limited to wood steps,
skirting and lattice work, form boards, piers and stiff legs. (Pressure treated
piling foundations are exempt from this requirement.)
3. Termite tunnels Scrape off all termite
tunnels from foundation walls and pillars.
4. Trenches Cut trenches a minimum of four
inches wide and deep, but not below top of footing, in contact with masonry
around all exterior and interior foundation walls and pillars and apply
pesticide according to label directions. Soil injection techniques will be
accepted by the Bureau when they are used in accordance with label
directions.
5. Pipes Pipes
underneath the structure should be treated by rodding or trenching according to
label directions. All non metal packing around pipes should be saturated with
an approved pesticide.
6. Treatment
of Masonry and Voids Approved pesticides shall be applied to porous areas,
cracks and voids in foundation walls, piers, chimneys, step buttresses and
other structures likely to be penetrated by termites. (1) Flood all cracks in
concrete. (2) Drill mortar joints on all two course brick formations such as
piers, foundation walls, chimneys, step buttresses, etc., in a horizontal line
at sufficient intervals to provide thorough saturation of wall voids but in no
case shall the distance between holes exceed 24 inches. Holes shall be deep
enough to reach the center mortar joint and shall be flooded under sufficient
pressure to flood all cracks and voids therein. Drilling shall not be required
when solid concrete footing extends above grade level or when wall is capped
with solid concrete. (3) Drill mortar joints on all brick formations with three
or more courses of brick on each side of formation at the end of every other
brick but with the locations of the holes on each side of the formation
alternating as much as is practicable and flood under pressure all cracks and
voids therein. Where the outside finish of a three course brick wall makes
drilling from each side of wall impractical, this wall can be drilled from one
side by extending holes two bricks deep. (4) Drill into the center of each
vertical core in a complete row of hollow concrete (or other light weight
aggregate) blocks in construction using this type of building material and
apply an approved pesticide into the openings. In hollow concrete block
construction, drilling will not be required where accessibility to the opening
is already available through construction.
7. Dirt Fills All dirt filled structures such
as concrete slab porches, steps, chimneys, porch columns, etc., shall be
treated by excavating, trenching, and applying pesticides in the same manner as
around pillars and foundations. EXCEPTION: If due to construction, it is
impractical to break into and excavate dirt filled areas, a method acceptable
to the Bureau such as drilling, flooding or rodding may be employed.
8. Beetles Approved controls must be applied
in accordance with subsections 119.01, 119.02 and 119.03 of these regulations
for beetles in timbers, walls and flooring, if beetles are present, unless
contract states that protection against beetle injury is not
included.