26 Miss. Code. R. 2-1.14 - DEVIATION OF HOLE AND DIRECTIONAL SURVEY
(a) Each operator
shall file on Form No. 3 a record of all deviation tests taken.
(b) No well shall cross drilling unit lines
unless permit is obtained from the Board after notice and hearing.
(c) Except as set forth in paragraphs (d),
(e) and (f) hereof, no well may be directionally deviated from its normal
course unless authorization so to do is first obtained from the Board after
notice and hearing.
(d) Intentional
deviations of short distances necessary to straighten the hole, sidetrack junk,
or correct other mechanical difficulties may be accomplished without the
issuance of a permit, but the operator shall immediately notify the Board by
letter, facsimile or e-mail (followed by letter) of the fact thereof.
(e) Intentional deviations may be
accomplished without notice and hearing where the application for permit and
location plat duly filed with the Board verifies that the unit configuration,
surface location, proposed bottom hole location and all perforations in
between, comply with the spacing requirements in Rules 7 and 8 or any special
field rules adopted for the field in which said well is located.
(f) In the event an operator in good faith
commences and proceeds with the drilling of a properly permitted well and
thereafter, for reasons acceptable to the operator, desires to directionally
deviate the well from its normal course, he may do so at his own risk, first
notifying the Board by letter or fax or e-mail of the fact thereof. On the
completion of such well as a producer, the operator must immediately apply for
a permit from the Board on notice and hearing for approval of such intentional
deviation. Pending such approval, the Board may assign a temporary allowable
only to such well.
(g) In cases of
directionally deviated drilling, the Board shall have the right to assess
appropriate allowable penalties to prevent undue drainage from offset
properties and to adjust possible inequities caused by the directional
drilling.
(h) When a well is
directionally deviated from its normal course for any reason, a complete
angular deviation and directional survey of the finished hole shall be made at
the expense of the operator and a certified copy of such survey shall be filed
with the Board within thirty (30) days.
(i) The Board shall have the right to make or
to require any operator to make a directional survey of any hole at such
operator's expense. The Board shall also have the right to require an operator
to make a directional survey of any hole at the request of an offset operator,
if, in the Board's opinion, such is necessary, but at the expense and risk of
said offset operator unless it is found that such well is completed at a point
outside the operator's drilling unit.
(j) All producible wells drilled which are an
exception to the spacing rules under Statewide Rule 9 shall have directional
surveys made to the total depth of the hole before setting the final string of
casing. A certified copy of such directional survey shall be filed with the
Board by the operator within thirty (30) days from the making thereof. This
requirement may be waived by the State Oil and Gas Supervisor, with the
concurrence of the Chief Engineer, upon acceptable proof filed by the operator,
whether by inclination survey or otherwise, that the bottomhole location did
not cross any unit boundaries.
(k)
For purposes of this rule, the term deviation shall mean any intentional
directional change in a wells normal course of any degree, including, but not
limited to, those which are horizontal.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.