28 Miss. Code. R. 301-15.6 - Procedures
The process for solicitation and evaluation of professional services recommended is as follows:
A.
RFQ/RFP. Preparation of a Request for Qualifications and Proposal
to include, but not be limited to the following information: Project
Identification, Project Objective/Goal, Required professional services, Order
of Magnitude Cost, Special Provisions, and Selection Criteria. If the project
is associated with any previously performed feasibility study, strategic master
plan, or special area plan, then a copy of the plan or study approved by the
Port Commission shall be provided.
B.
Solicitation. Proposals shall
be solicited from qualified firms on an industry-wide basis and based upon the
disciplines required. The Mississippi State Port Authority shall maintain an
active list of firms interested in providing project management, architectural,
engineering, design, and construction management on file with the MSPA staff
Engineer. Firms seeking to be placed on a list of firms interested in providing
services shall complete Standard Form #254 "Architect-Engineer and Related
Services Questionnaire".
1.
Specific
Request Projects. For a specific project, a Request for Qualifications
and Proposal shall be mailed to firms on the Port Authority's active list;
shall be published in a newspaper of general circulation in Harrison County;
shall be distributed to industry clearinghouses related to the specific
services needed; and shall be mailed to firms on an industry wide basis who are
normally engaged in the disciplined required.
2.
Non-Active List Firms. As
part of the Request for Qualifications, all firms not on MSPA's active list,
shall provide a list of every job performed over the last three (3) years in
the area of discipline being sought that is in excess of $100,000 or an amount
comparable to the overall project budget as set by the Executive Director in
the solicitation. Failure to disclose such information may be grounds to
disqualify the firm.
3.
Cut-Off Date to Respond. A specific cutoff date and time for
submitting the required information will be included in the
solicitation
C.
Selection Criteria. The Executive Director shall be responsible
for establishing selection criteria for specific projects.
D.
Staff Evaluation. The Port
staff will make an independent evaluation of all the firms responding to the
Port Authority Request for Qualifications and Proposal for each specific
project. The independent evaluation shall include selecting past clients to
make inquiries regarding past experience with the firm. Specific questions to
be answered are:
1. Was the quality of work
satisfactory?
2. Was the work
perform in a timely manner?
3. Was
the proposed budget for the project met? If not, why?
4. How were professional fees established for
the project? Were the professional fees within the established limits of the
project? If not, why?
5. Are there
any potential claims from the contractor, subcontractors, or other vendors
related thereto? Are there any threats of litigation related thereto?
6. Should this firm be recommended for
employment again?
E.
Ranking of Potential Candidates. Upon completion of the background
investigation, the Port staff will review and rank the firms based upon the
evaluation factors in this operating procedure and/or those established by the
Executive Director in the Request for Proposal for related projects. A written
staff evaluation shall be provided to the Executive Director ranking all of the
firms in the following categories:
1. Firms
Highly Qualified and Recommended for further consideration.
2. Firms Qualified for the Related
Services
3. Firms Not Qualified and
Not Recommended for further consideration.
F.
Recommendation. The Executive
Director shall review all the materials related to the staff evaluation. Based
upon his independent evaluation, the Executive Director may, in his sole
discretion, alter the ranking of the staff evaluation of the firms'
qualifications and experience to perform the related services.
G.
Selection - Phase One. The
Executive Director shall select the top firms deserving further consideration.
The Executive Director's finalists shall be reviewed with the Mississippi
Development Authority.
H.
Selection - Phase Two. Following a review and evaluation, the
Executive Director and the Mississippi Development Authority shall submit a
joint recommendation to the Board of Port Commissioners for their review and
consideration. The Board shall select the principal firm to negotiate a fee
contract with and an alternate firm to be negotiated with only if the Executive
Director and the selected firm are unable to reach agreement. In submitting the
joint recommendation to the Board of Port Commissioners, copies of all
submittal and materials that influenced the recommendation shall be provided to
the members of the Port Commission.
I.
Selection - Phase Three. The
Board of Port Commissioners shall review and consider the selection of the firm
best qualified and experienced to perform the related services at a regular or
special public meeting. The Port Commission shall select the firm and one
alternate for the Executive Director to negotiate a professional services
contract. All firms that proposed on the project shall be notified of the
meeting along with the Executive Director's recommendation.
J.
Modification of Selection
Process. Based upon the scope of the project and prior to initiation of
the selection process, the Executive Director may with the concurrence of the
Port Commission modify the selection process. This operating procedure shall
not limit the Board's decision to invite finalist to appear before them at a
regular meeting for further questioning and interviewing. Selection by the
Board of Port Commissioners shall be based upon Qualifications and Experience
for the related services.
K.
Fee Negotiations. Proposed fees shall not be entered into the
selection process. Upon selection by the Board of Port Commissioners of the
best qualified and experience firm, negotiations shall be undertaken by the
Port Authority's Executive Director. Fees may be negotiated either on a fixed
fee, time and materials with a cost not to exceed, or percentage of contract
cost basis.
If during the fee negotiations, the Executive Director declares an impasse between the firm selected and the Management, the Port Commission may direct the Executive Director to resolve the impasse on specific terms and conditions or may direct the Executive Director to initiate negotiations with the alternate firm.
L.
Contract Provisions. All
terms and conditions of the professional services contract shall be consistent
with the Request for Proposal and Qualifications. The proposed fee schedule
shall be consistent with local standards for related type of services within
the State of Mississippi. The contract terms and conditions shall be consistent
with the terms and conditions of the Port's Construction General
Conditions.
M.
Engineering
Firm Supervision Requirement. All engineering services shall include
provisions that requires a representative firm to be present at the job site
for critical phases of the work (i.e. cover-up work such as the pouring of
reinforced concrete) to insure that the contractor is complying with the
construction specifications of the project. All engineering firms engaged in
construction management firms shall sign a certificate stating that the project
was "constructed in full compliance with the Plans and Specifications of the
Construction Contract"
N.
Interpretation. All administrative interpretation of these
procedures shall be made by the Executive Director. Nothing in this operating
procedure shall prohibit the procedures for selection of project management,
architectural, engineering, design, and construction management services to be
modified to meet specific project requirements. It shall be the responsibility
of the Executive Director to identify all changes and modifications to these
operating procedures prior to official solicitation of the proposal.