30 Miss. Code. R. 603-3.2 - Cost Recovery Plan
1. Upon receipt of
a request for wireless E9-1-1 service from a Mississippi Emergence
Communication District or Districts (ECDs), the CMRS carrier will develop a
comprehensive detailed plan for implementation of E9-1-1 service for the ECD,
or the appropriate service area if the CMRS carriers switch serves more than
one ECD.
2. The plan, complete with
cost information, will be presented to the requesting ECD for concurrence. Upon
acceptance of the plan and the associated cost structure by the ECD, the ECD
(in person or by proxy) and CMRS carrier will present the plan to the Board for
its approval. The CMRS carrier shall present in writing to the Board detailed
coverage area and customer information to ensure expedient roll-out of wireless
E9-1-1 service as requests are received and approved by the Board.
3. After initial acceptance of a CMRS
carriers plan using a particular solution by the Board, the CMRS carrier need
not make additional presentations to the Board as to that particular solution.
Certified letters shall be sent to the Board with notification of additional
serve implementation in the state and the resulting cost recovery
represented.
4. The initial cost
recovery plan presented to the Board is intended to allow for the recovery of a
carriers cost on a one time basis (NRC) and/or recurring monthly basis (MRC). A
list of anticipated MRCs and NRCs is set forth below, but the list will vary
depending upon the CMRS carrier and the selected E911 solution:
Trunks:
Trunking
Connection fee to 9-1-1 Selective Router (per DSO)
Engineering & Network Costs:
Facilities; T-1's, selective router ports
Routing Charges
Operations
Engineering
Switch upgrades
Research & Development
Network design
Test plan development
Database Cost
P-ANI administration
Database management
Other
Reporting
Software
Other
5.
The Board shall provide the CMRS carrier either approval or denial of the cost
recovery plan in writing, and send by certified United States Mail or by any
other express service requiring a delivery signature. If the Board denies a
CMRS carriers cost recovery plan, the Board shall provide express reasons for
the denial in writing within 3 days of the denial. The CMRS carrier may
resubmit or revise cost recovery plans as soon as the Board approves an
acceptable date. If the Board approves the cost recovery plan, then the CMRS
carrier and the Board shall sign the model contract, attaching the cost
recovery plan.