35 Miss. Code. R. 4-07-03-208

"Manufacturing" begins at the point where the raw materials are transferred to the actual processing operation from storage or stockpile at the plant, and ends when the manufactured product leaves the assembly line for storage or shipment, and includes the processing of the by-product or waste materials to avoid air and water pollution.

Notes

35 Miss. Code. R. 4-07-03-208
Amended 8/23/2015 Amended 5/27/2017 Amended 8/26/2024

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.