37 Miss. Code. R. § 1-6203-00600-500
The following situations may indicate DBE program noncompliance with the commercially useful function requirement and should be reported:
1. The DBE is performing
work outside the areas listed on OCR-481.
2. The DBE provides little or no supervision
to his/her employees for work performed by them. Supervision is provided by
someone else not employed or under the control of the DBE and the DBE is rarely
seen on the project site.
3. The
DBE's work is performed by personnel normally employed by another contractor.
Prime contractor's employees are not allowed to perform the DBE's work. The DBE
contractor must prepare and submit their own payrolls.
4. The materials and equipment being used by
the DBE belongs to another contractor and no rental agreements have been
submitted to the project engineer.
5. Materials and supplies needed to perform
the DBE's work are delivered to, billed to or paid for by another
contractor.
6. The DBE
subcontractors-subs portions of the work that is assigned to him by the prime,
to a non-minority contractor.
7.
The DBE is working on the project without an approved subcontract agreement or
CAD-720.
8. A DBE trucking
subcontractor uses or rents trucks from the prime contractor.
9. A DBE (prime contractor) subcontracts more
than the allowed 60% of the total contract.