39 Miss. Code. R. 1-17-102 - Purchased Energy
The allowable cost of purchased energy shall include the following costs, if prudently incurred, which are appropriately recorded in FERC account 555 (excluding all capacity or demand related charges):
1. The actual identifiable fossil and nuclear
fuel costs associated with energy purchased for reasons other than identified
in paragraph (2) below.
2. The net
energy cost of energy purchased exclusive of capacity or demand charges
(irrespective of the designation assigned to such transaction) when such energy
is purchased on economic dispatch basis. Included therein may be such costs as
the charges for economy energy purchased and the charges as a result of
scheduled outages, all such kinds of energy being purchased by the buyer to
substitute for its own higher cost energy.
3. All costs, net of costs associated with
interconnection or otherwise recovered from a qualifying facility, incurred by
an electric utility for purchases of power and/or energy from a qualifying
facility pursuant to a standard rate for purchase or other legally enforceable
obligations as provided in the rules of the Commission governing cogeneration
and small power production, and less.
4. The Less the cost of fossil and nuclear
fuel recovered through inter-system sales including the fuel costs related to
economy energy sales and other energy sold on an economic dispatch
basis.