A. Provide a sample
Savings Measurement and Verification Plan from a completed GESP or SSC by the
ESP including an estimate of the total number of measurement points currently
being monitored by ESP for that project.
B. Provide a sample Investment Grade Energy
Audit conducted by the ESP which includes detailed energy and economic
calculations for ESPs wanting to implement GESPCs or SSCs.
C. Provide a sample Operations and
Maintenance Manual developed by the ESP for a completed GESPC or SSC.
D. Provide a sample Commissioning
Plan from a GESPC or SSC implemented by the ESP.
E. Provide a sample Final Design
Specification for an installed ECM (e.g. HVAC, controls, etc.).
F. Provide a sample Customer Savings Report
from a GESPC or SSC implemented by the ESP.
G. Provide a sample Customer Training Plan
used in a GESPC or SSC implemented by the ESP.