PURPOSE: This amendment updates the forms in sections
(1), (2), (3), (6), and (7).
PUBLISHER'S NOTE: The secretary of state has
determined that the publication of the entire text of the material which is
incorporated by reference as a portion of this rule would be unduly cumbersome
or expensive. This material as incorporated by reference in this rule shall be
maintained by the agency at its headquarters and shall be made available to the
public for inspection and copying at no more than the actual cost of
reproduction. This note applies only to the reference material. The entire text
of the rule is printed here.
(1) Prior to any installations at buildings
of public assembly or use such as schools, churches, recreational halls,
tourist courts, hotels, hospitals, sanitariums, convalescent homes, nursing
homes, rest homes, four- (4-) unit apartments, and larger or similar types of
public buildings having institutional occupancies, for new construction, major
renovations, or additions to these installations and mobile home parks,
shopping center areas, service stations, bulk plants, industrial plants, and
other similar locations of public gathering, form MPSC-0910 must be completed
and submitted to the inspection authority. Form MPSC-0910, January 1, 2016, is
published by the Missouri Propane Safety Commission, 4110 Country Club Dr.,
Ste. 200, Jefferson City, MO 65109-0302 and is incorporated by reference. This
rule does not incorporate any subsequent amendments or additions to the
referenced material.
(2) The owner
of a retail cylinder exchange cabinet shall submit a completed form MPSC-0955
to the commission within fifteen (15) days following the installation of a
cylinder exchange cabinet.
(3) Form
MPSC-0910 including detailed plans shall be furnished to the inspection
authority for approval before installation of LP gas containers having a water
capacity of over two thousand (2,000) gallons, or two (2) or more containers
that are to be connected and have a combined capacity exceeding four thousand
(4,000) gallons, or when LP gas in the liquid phase is to be withdrawn or of a
container charging plant where portable containers are to be recharged and
filled regardless of the capacity of the storage containers used as the supply
for filling containers and cylinders. Form MPSC-0910, January 1, 2016, is
published by the Missouri Propane Safety Commission, 4110 Country Club Dr.,
Ste. 200, Jefferson City, MO 65109-0302 and incorporated by reference. This
rule does not incorporate any subsequent amendments or additions to the
referenced material. When approval is granted, one (1) copy of the plans will
be returned to the party submitting the original proposal. Final inspection and
approval is required before placing the installation into service. If
installation of the proposed LP gas system has not begun within one hundred
eighty (180) days from the date of approval by the state LP gas inspection
authority, new plans shall be resubmitted prior to the time installation does
begin.
(4) The following
requirements shall be met on plans that shall be submitted to the inspection
authority of Missouri for approval before starting construction:
(A) A complete copy of the plans shall be
submitted to the inspection authority together with detailed
specifications;
(B) Plans shall be
on good quality paper, legible, and contain the information required by this
section; and
(C) Plans and
specifications are to be accompanied by a written application on a form
prescribed by the inspection authority and shall include the following:
1. The address of the proposed location and
the name and mailing address of the owner or builder;
2. An outline of the boundary lines of the
property owned or leased;
3. A
diagram showing adjoining property on all sides and the distance to all
adjacent buildings and roadways;
4.
A diagram showing the location and sizes of each container or containers on the
plot of ground to be used;
5. A
diagram pinpointing each location where liquid transfer will be made, such as
loading, unloading, and bottling;
6. A general layout of piping, pipe supports,
and pipe protection; the location, size, and type of each important piece of
equipment, gate valve, excess flow valve, pressure relief valve, hose,
regulator, and all other important parts of the system planned;
7. The location of each building or shed to
be built on the property and each sewer or drain opening;
8. The location of electrical lines and poles
and telephone poles if located twenty-five feet (25') or less from storage
tanks or liquid transfer areas;
9.
The location of the electrical service pole;
10. The location of fences;
11. The dimensions of tank foundations,
footings, reinforcements, and tank clearance above ground level;
12. Storage container dimensions, whether new
or used, and the name of the manufacturer; and
13. All used containers of two thousand
(2,000) gallons water capacity or more to be reinstalled shall have all valves,
including relief valves, removed and inspected.
(5) All LP gas storage tanks shall be
installed a minimum distance of twenty feet (20') from all other Class I, II,
and III liquids. In the event of a hazardous location, the LP gas inspection
authority may require a greater distance and location up to a maximum distance
of one hundred feet (100'). Distance may be reduced to ten feet (10') when
diked.
(6) All LP gas dispensers
shall have form MPSC-0910 and site plans submitted as required by sections (3)
and (4).
(7) All tanks of one
thousand one (1,001) gallons aggregate water capacity or greater being used for
liquid withdrawal shall have form MPSC-0910 and site plans submitted as
required by sections (3) and (4).
(8) All LP gas and autogas dispensers shall
have recommended fill procedures posted.
(A)
All dispensers in the retail business of refilling cylinders shall be equipped
with a state-approved scale to be utilized for the safe filling of LP gas
cylinders.
Notes
2 CSR
90-10.013
AUTHORITY: section
323.020,
RSMo Supp. 2012.* Original rule filed July 13, 1977, effective Nov. 11 , 1977.
Amended: Filed May 2, 1985, effective Sept. 27, 1985. Amended: Filed March 3,
1989, effective June 29, 1989. Amended: Filed Nov. 13, 1997, effective June 30,
1998. Amended: Filed Dec. 3, 2001, effective June 30, 2002. Amended: Filed Oct.
15, 2008, effective March 30, 2009. Amended: Filed June 13, 2011 , effective
Jan. 30, 2012. Amended: Filed June 26, 2012, effective Jan. 30, 2013.
Amended by
Missouri
Register January 3, 2017/Volume 42, Number 1, effective
2/28/2017
Amended by
Missouri
Register September 1, 2017/Volume 42, Number 17, effective
10/31/2017
*Original authority: 323.020, RSMo 1947, amended 1994,