122 Neb. Admin. Code, ch. 20, § 004
For Class V Injection Wells authorized by permit, monitoring requirements shall, at a minimum, include:
004.01 The analysis of the physical and chemical characteristics of the injected fluid with sufficient frequency to yield representative data on its characteristics;
004.02 Installation and use of devices to monitor the injection pressure, flow rate and volume as specified by the Department;
004.03 Demonstration of mechanical integrity pursuant to Chapter 18 of this Title at least once every five years during the life of the well;
004.04 Monitoring of fluid level and the parameters chosen to measure water quality in the injection zone as specified by the Department; and
004.05 Monitoring of wells adjacent to the injection site to detect any migration from the injection zone into an USDW as specified by the Department.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.