Nev. Admin. Code § 449.179 - Submission and approval of plan for new construction or remodeling; inspection; evidence of compliance
1. Except for a
residential facility with less than 11 beds, before a residential facility is
constructed or an existing facility is remodeled, the facility must:
(a) Submit the plan for construction or
remodeling to the entity designated to review such plans by the Division
pursuant to the provisions of NAC
449.0115;
(b) Notify the Bureau of a tentative date for
the completion of the construction or remodeling; and
(c) Obtain approval of the plan from the
Division.
2. The plan
for construction or remodeling must include a description of the materials that
will be used to complete the project.
3. Before issuing a license to operate a
residential facility, the Bureau shall inspect the facility to ensure that it
complies with:
(b) The applicable zoning
ordinances and regulations.
4. An applicant for a license to operate a
residential facility must submit to the Bureau with his or her application
evidence that the applicant and the facility are in compliance with the
provisions of NRS
449.001 to
449.240, inclusive, and NAC
449.156 to
449.27706, inclusive.
5. The Bureau shall not perform the
inspection required pursuant to subsection 3 until the applicant has submitted
to the Bureau the application required pursuant to
NRS
449.040, the fee required pursuant to NAC
449.016 and the evidence required
pursuant to subsection 4.
Notes
NRS 449.0302
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.