N.H. Admin. Code § Lab 1403.42 - Overheads and Gantry Hoists and Cranes
The employer shall ensure compliance with the following requirements:
(a) All functional
operating mechanisms, air and hydraulic systems, chains, rope slings, hooks,
and other lifting equipment shall be visually inspected before each use by the
operator;
(b) Complete inspection
of the crane shall be performed at least once per year;
(c) The inspection shall include the
following:
(1) Identifying deformed, cracked,
corroded, worn, or loose members or parts; and
(2) Ensuring the good working order of the
following:
a.Brake system;
b.Limit indicators;
c.Power plant; and
d.Electrical apparatus;
(d) Overhead cranes shall have
stops at the limit of travel of the wheels; and
(e) The rated load of the crane shall be
plainly marked on each side of the crane as follows:
(1) If the crane has more than one hoisting
unit, each hoist shall have its rated load marked on it or its load block;
and
(2) The marking shall be
clearly legible from the ground or floor.
Notes
#4118 eff 8-22-86, EXPIRED: 8-22-92
New. #6684, eff 2-4-98, EXPIRED: 2-4-06
New. #8606, INTERIM, eff 4-12-06, EXPIRED: 10-09-06 (formerly Lab 1403.55)
New. #8796, eff 1-11-07