N.J. Admin. Code § 16:41C-6.2 - Permit applications
(a) An application for a permit and the
permit application fee shall be submitted to the Office of Outdoor Advertising
Services at the address found at
N.J.A.C.
16:41C-1.3.
(b) Permit applications forms can be obtained
by requesting the form from the Department, in writing, at the address found at
N.J.A.C.
16:41C-1.3 or downloaded from the
Department's website at:
http://www.state.nj.us/transportation/business/outdoor/forms.shtm.
(c) Each application shall specify the
location where the sign is to be erected and maintained. The application shall
depict graphically the location of the proposed sign by showing its distance
from the nearest intersecting road, railroad crossing, bridge, or other
permanent point of reference. The measurement shall be made along the nearest
edge of the highway pavement from the closest permanent place of
identification, such as an intersecting road, railroad crossing, or bridge to
the proposed sign location. If a sign is built at a location other than that
specified in an approved application, the sign shall be deemed to be
unauthorized by a permit.
(d) A
single application shall cover a double-faced, back-to-back, side-by-side, or
V-type sign, provided that those signs are physically contiguous, connected by
the same structure or cross-bracing, or located not more than 15 feet apart at
their nearest point. The fee charged will be for the total advertising surface
area at that location.
(e)
Applications that contain incorrect or conflicting information shall be deemed
incomplete and shall be returned to the applicant for completion or correction.
If a corrected application is not received by the Department within 30 days of
notification that the application was deemed incomplete, the application will
be considered withdrawn and no further action will be taken by the
Department.
(f) Applications for
signs that are subject to the jurisdiction of the Pinelands Commission shall
include a Certificate of Filing, a Notice of Filing, a Certificate of
Completeness, a resolution of the Pinelands Commission approving the
development of the sign, or such other document that satisfies the requirements
of N.J.A.C.
7:50-4.81(b). Applications
submitted without such documentation shall be deemed incomplete and shall be
returned to the applicant in accordance with (e) above.
(g) Applications deemed complete shall be
assigned an application number by the Department and shall be reviewed pursuant
to the provisions of
N.J.A.C.
16:41C-6.3.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.