N.J. Admin. Code § 16:47-8.6 - Additional Department permits
(a)
Applicants undertaking activities that require an access permit and a highway
occupancy permit for drainage, curb, sidewalks, handicap ramps, landscaping,
tree trimming, vegetation control, unclassified landscaping, grading,
guiderail, crosswalks, bus shelters or benches, or lane or shoulder closings on
State highways pursuant to N.J.A.C. 16:41, Highway Occupancy Permits, shall
submit one access application for the combination of these activities. The
Department may issue a single access permit to authorize all of these
activities for the lot or site consistent with the provisions of N.J.A.C. 16:41
and this chapter.
(b) Other permits
or approvals requiring application separate from an access permit issued
pursuant to this chapter may be necessary for occupancy of the State highway
ROW. These permits or approvals include, but are not limited to, those issued
pursuant to: N.J.A.C. 16:25, Utility Accommodation; 16:27, Traffic Regulations
and Standards for Traffic Control Devices; 16:41, Highway Occupancy Permits,
for actions other than those referenced above; 16:41B, Newspaper Boxes on State
Highway Right-of-Way; and 16:41C, Roadside Control and Outdoor
Advertising.
(c) An access permit
may be issued for construction of a driveway or street that requires the
relocation of public or private utility facilities. Utility relocations shall
be the responsibility of the lot or site owner and at the owner's expense.
Should a utility have attached to it a State-owned facility connection, the
Department will relocate the service connection at the lot or site owner's
expense. Separate permits, as required by N.J.A.C. 16:41, shall be obtained by
the utility company for utility relocations.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.