N.J. Admin. Code § 7:13-7.11 - Permit-by-rule 11 - reconstruction, relocation, and/or elevation of a lawfully existing building
(a)
Permit-by-rule 11 authorizes the reconstruction, relocation, and/or elevation
of a lawfully existing building located outside a floodway at the time of
reconstruction, relocation, and/or elevation, provided the conditions at
N.J.A.C.
7:13-6.7 are met and:
1. The building is not expanded within or
relocated into a floodway;
2. The
footprint of the existing building does not increase by more than 400 square
feet, cumulatively, since November 5, 2007;
3. The lowest floor of the building is
reconstructed or elevated to at least one foot above the flood hazard area
design flood elevation and no lower than the elevation required under the
Uniform Construction Code, N.J.A.C. 5:23;
4. Any new enclosure below the lowest floor
of the building is not used for habitation, remains open to floodwaters, and is
constructed in accordance with
N.J.A.C.
7:13-12.5(p);
5. Any existing enclosure below the lowest
floor of the building, which does not conform to the requirements of
N.J.A.C.
7:13-12.5(p), such as a
basement having a floor that is below grade along all adjoining exterior walls,
is abandoned, filled-in, and/or otherwise modified to conform with the
requirements of
N.J.A.C.
7:13-12.5;
6. No disturbance is located within 25 feet
of any top of bank, unless the project lies adjacent to a lawfully existing
bulkhead, retaining wall, or revetment along a tidal water or impounded fluvial
water;
7. Any building being
relocated is either moved outside a riparian zone or located within an actively
disturbed area; and
8. No riparian
zone vegetation is cleared, cut, and/or removed, except for vegetation within
20 feet of the building, where such disturbance is necessary to access the
building and facilitate its reconstruction, relocation, and/or
elevation.