N.J. Admin. Code § 7:14A-25.9 - Individual NJPDES permit applications for small MS4s
(a) An
operating entity that is subject to
N.J.A.C.
7:14A-25.5(a) shall apply
for an individual NJPDES permit under (c) or (d) below for stormwater
discharges from small MS4s if:
1. An
application is required pursuant to
N.J.A.C.
7:14A-2.4(c) or 6.13(e), in
which case the Department shall specify whether (c) and/or (d) below is
applicable; or
2. A general NJPDES
permit applicable to the entity's small MS4 stormwater discharge is not
available.
(b) An
operating entity that is not required under (a) above to apply for an
individual NJPDES permit may on its own initiative apply for an individual
NJPDES permit under (c) below for stormwater discharges from small
MS4s.
(c) The following is
applicable to an operating entity that seeks authorization to discharge under
an individual NJPDES permit, and seeks to implement under the permit a
stormwater program that is different from the stormwater program under
N.J.A.C.
7:14A-25.6.
1. If the permit is for discharge to surface
water, the operating entity shall submit to the Department a permit application
that includes the information required by
N.J.A.C.
7:14A-25.10(a). The entity
does not need to submit the information required by
40
C.F.R. 122.26(d)(1)(ii) and
(d)(2)(i) regarding the entity's legal
authority, unless the entity intends for the Department to take such
information into account when developing the entity's permit
conditions.
2. If the permit is for
discharge to groundwater, the operating entity shall submit to the Department a
permit application that includes:
i. The
information required by
N.J.A.C.
7:14A-4.3 (except 4.3(a)11 and 15 through 24)
and 7.9. In accordance with
N.J.A.C.
7:14A-7.9(a)1, the entity
shall submit the information required pursuant to
N.J.A.C.
7:14A-7.9(d), except when,
after consultation with the Department during a pre-application conference, it
is determined that the information is not necessary to develop permit
conditions for the small MS4;
ii.
An 8.5 inch x 11 inch copy of a portion of a U.S. Geological Survey Topographic
Map(s), 7.5 minute Quadrangle Series extending one mile beyond the area served
by the small MS4 that is the subject of the permit application. The boundaries
of that area shall be marked on the copy; and
iii. Any information required by the
Department under
N.J.A.C.
7:14A-8.17 (if an individual UIC permit is
sought).
(d)
An operating entity that seeks to implement a stormwater program under
N.J.A.C.
7:14A-25.6 may seek authorization to
discharge under an individual NJPDES permit only if the Department requires
that entity to submit an application under (a)1 above and this subsection, or
if an application is required under (a)2 above. The operating entity shall
submit to the Department an application that includes:
1. The information required under
N.J.A.C.
7:14A-4.3(a)1, 2, 3, 6 and
9, and 25.6(c);
2. An estimate of
the area, in square miles, served by the entity's small MS4;
3. A map, showing the location of the end of
MS4 outfall pipes, that satisfies the requirement for such a map in
N.J.A.C.
7:14A-25.6(b)5 i (if the
entity operates any MS4 outfall pipes);
4. Any information required under
N.J.A.C.
7:14A-8.17 (if an individual UIC permit is
sought); and
5. Other information
required under
N.J.A.C.
7:14A-4.3(e).
(e) If a small MS4 is in the same
urbanized area as a medium or large MS4 with a NJPDES stormwater permit, and if
the operating entity for the medium or large MS4 is willing to have the
operating entity for that small MS4 participate in its stormwater program, both
operating entities may jointly seek a modification of the medium or large MS4
permit to include the operating entity for the small MS4 as a limited
co-permittee. As a limited co-permittee, the operating entity for the small MS4
will be responsible for compliance with the NJPDES permit conditions applicable
to that entity's jurisdiction. If an operating entity for a small MS4 chooses
this option for discharge to surface water, the entity shall comply with
N.J.A.C.
7:14A-25.10(a) rather than
N.J.A.C.
7:14A-25.6, except that the entity does not
need to comply with
40
C.F.R. 122.26(d)(1)(iii) and (iv) and
(d)(2)(iii) (discharge characterization). The
entity may satisfy the requirements in
40
C.F.R. 122.26(d)(1)(v) and
(d)(2)(iv) (identification of a management
program) by referring to the medium or large MS4's stormwater
program.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.