N.M. Admin. Code § 14.5.3.15 - CONNECTION APPROVAL

A. Plumbing. No person shall connect, or reconnect, any plumbing system to an energy or water source or to a sewer system until the AHJ or appropriate inspector has given approval to do so.
B. Mechanical. No person shall connect, or reconnect, any mechanical system or equipment to an energy, fuel or other power source until the AHJ or appropriate inspector has given approval to do so.
C. Electrical. No person shall connect, or reconnect any electrical wiring to an energy source until the AHJ building official or appropriate inspector has given approval to do so.
D. Exception. A public or private utility may make a connection from a supply of water or gas to an installation if, the appropriate AHJ has failed to approve or disapprove the work or installation to which the connection will be made within seven working days after receiving notification that the work is ready to inspect.

Notes

N.M. Admin. Code § 14.5.3.15
14.5.3.15 NMAC - Rp, 14.5.3.8 NMAC, 14 NMAC 9.2.I.100, 14 NMAC 9.2.II.100 & 14.10.4.8 NMAC, 7-1-04, Adopted by New Mexico Register, Volume XXVII, Issue 21, November 15, 2016, eff. 11/15/2016, Adopted by New Mexico Register, Volume XXXIII, Issue 03, February 8, 2022, eff. 3/10/2022