N.M. Admin. Code § 14.7.5.18 - PROFESSIONAL SEAL REQUIREMENT AND CERTIFICATE OF OCCUPANCY

A. Construction documents detailing the structural design of the structure shall be prepared by a licensed New Mexico architect or structural engineer. The architect or engineer stamp must be affixed to each page of the plans detailing construction of the structure with the design processionals signature and date affixed over each stamp.
B. Prior to issuance of a certificate of occupancy by the construction industries division, an inspection report must be provided to the general construction inspector by the licensed New Mexico architect or structural engineer. The report shall attest to the building's structural integrity and conformance with the permitted drawings.

Notes

N.M. Admin. Code § 14.7.5.18
14.7.5.18 NMAC - Rp, 14.7.5.18 NMAC, 1-1-08

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.