N.M. Admin. Code § 14.9.4.25 - INSPECTION METHODS AND FREQUENCY
The owner or user of such inspected equipment shall be responsible for obtaining a certificate of inspection. The method and frequency of boiler inspections shall be as follows:
A. The following equipment shall be inspected
internally annually. A certificate inspection may be issued with an external
inspection; however, an internal inspection must be made within six (6) months
of the external inspection. When the construction does not permit an internal
inspection, one external inspection annually is required:
(1) high-pressure boilers; [and]
(2) high-pressure steam generators.
B. Every twenty-four (24) months,
an external and internal inspection shall be performed on the following:
(1) direct fire steam jacketed
kettles;
(2) low-pressure steam
boiler; [and]
(3) low-pressure
hot-water heating boilers.
C. Based upon documentation regarding actual
service conditions, the mechanical bureau may, at its discretion, permit
variations in the inspection requirements.
D. The inspections herein required, including
repair or modification shall be made by the mechanical bureau or by an [sic]
special inspector.
E. If, at the
discretion of the special inspector, a hydrostatic test shall be deemed
necessary, the test shall be performed and the expense shall be borne by the
owner or user of the boiler and the test shall be witnessed by the special
inspector.