N.M. Admin. Code § 14.9.4.29 - BOILER OPERATOR/CERTIFICATE OF COMPETENCE
A. Pursuant to Section
60-13-38 of the New Mexico
Construction Industries Licensing Act and LPG Act (NMSA 1978), the New Mexico
boiler operator classifications are listed below.
(1) Classification: boiler operator trainee:
(a) Experience: entry level
position.
(b) Limitations: shall
not operate any devices except under the direct observation of a boiler
operator.
(2)
Classification: boiler operator low pressure:
(a) Experience: six months operating
experience on the type(s) of plant to be licensed on, and pass the low pressure
examination.
(b) Limitations: may
operate steam boilers and direct-fired pressure vessels up to 15 psi, and hot
water boilers up to 160 psi and/or 250 degrees F
(3) Classification: boiler operator high
pressure:
(a) Experience: have at least six
(6) months verifiable operating experience on the type(s) of plant to be
licensed on, and pass the prescribed examination.
(b) Limitations: may operate high-pressure
boilers (15 psi and greater), steam boilers and direct-fired pressure vessels
up to 15 psi, and hot water boilers up to 160 psi and 250 degrees F, As per
manufacture's instructions.
B. No state certificate of competence is
required for a boiler operator trainee.
C. A certificate of competence is required
for boiler operators.
D. In lieu of
experience, alternative methods of training may be approved by the mechanical
bureau chief. A certificate of competency will be issued upon successful
completion of the appropriate examination.