N.M. Admin. Code § 17.13.940.13 - MINIMUM DATA REQUIREMENTS
The following exhibits must be attached to and made a part of a water utility's application for a certificate of public convenience and necessity:
A. Evidence of Ownership:
(1) Corporation--certificate of incorporation
and by-laws;
(2)
Partnership--articles of co-partnership;
(3) Subsidiary affiliation;
(4) Company officials;
(5) Business address;
(6) Actual location of plant facilities and
business office(s).
B.
Statement showing franchise rights of applicant to provide sewer services in
the community in which service is proposed.
C. Evidence of economic feasibility:
(1) Statement demonstrating Applicant's
financial ability;
(2) Proposed
Facilities:
(a) Cost of proposed
facilities;
(b) Financing of
proposed facilities; (Supply details of all present and proposed financing
arrangements.)
(3)
Revenue requirements:
(a) Source of funding
for operation and maintenance;
(b)
Revenues;
(c) Expenses;
(d) Depreciation;
(e) Taxes;
(f) Return (net income).
D. Evidence of compliance with the
Water Quality Control Commission regulations.
E. One complete set of design plans and
specifications as required by the New Mexico Health and Environment
Department's publication titled "Guidelines for Wastewater Collection and
Treatment Works in New Mexico". All plans and specifications shall be prepared
under the direction and approved by a New Mexico registered professional
engineer. Plans and specifications shall bear the seal of the professional
engineer.
F. Easement and
right-of-way policy.
G. Appropriate
Permits:
(1) State Land Office;
(2) State Health and Environment
Department;
(3) Environmental
Protection Agency.
H.
Evidence of system adequacy (present and 3 years projected).
(1) Proof of experience to provide adequate
and efficient service;
(2) Design
capacity of treatment and disposal plant;
(3) Characteristics of sewage being
treated;
(4) Peak day flow
rate;
(5) Average daily flow
rate;
(6) Complete description of
biological-treatment process and BOD loadings.
I. Original cost listing of plant items. If
plant has already been constructed and is in operation, the utility shall:
(1) Provide a list of plant items and show
the original cost of each plant item as prescribed in the NMPSC Annual
Report;
(2) Submit a completed
NMPSC Annual Report if the plant has been in operation for at least twelve (12)
months.
(3) A complete set of
as-built plans and specifications of the system constructed.
J. Copies of tariff schedules and
operating rules and regulations:
(1) Rate
schedules for each customer class;
(2) Copies of operating rules and
regulations.
K. A rate
study setting rates that would apply if the system were developed to 85% of its
potential plant-in-service capacity. The study should include but not be
limited to:
(1) Estimated cost of service and
supporting documents;
(2) Potential
number of equivalent residential connections based on treatment plant in
service;
(3) Potential number of
equivalent residential connections based on collection mains in
service.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.