N.M. Admin. Code § 17.9.569.2 - SCOPE
A. This rule
applies to every electric utility including rural electric cooperatives and
investor-owned utilities operating within the state of New Mexico that is
subject to the jurisdiction of the New Mexico public regulation commission.
These standards and procedures apply to both qualifying and non-qualifying
facilities.
B. The standards and
procedures described in this rule 17.9.569 NMAC apply only to the
interconnection of generating facilities with a rated capacity greater than 10
MW. The standards and procedures described in 17.9.568 NMAC apply to the
interconnection of generating facilities with a rated capacity up to and
including 10 MW.