N.M. Admin. Code § 18.17.3.9 - APPROVED PLANS AND CERTIFICATION OF COMPLETION
A. Persons seeking to construct a boat dock
shall submit to the division: two complete sets of project plans for the boat
dock, including the anchoring system, and any catwalks or bridges that will
attach to the boat dock; the surety bond required by
18.17.3.11 NMAC; and the permit or
approval from other entities with authority over the lake or body of water.
(1) When a boat dock will use existing
facilities as part of the new proposed boat dock, the project plans shall
include a complete description of the existing facilities, and those facilities
shall comply with the specifications set forth in 18.17.3 NMAC.
(2) The plans must be signed and sealed by a
registered professional engineer, and contain a statement that the proposed
boat dock complies with the specifications set forth in 18.17.3 NMAC.
(3) Each plan set also shall include a copy
of the manufacturer's certified plans for any components that will be a part of
a boat dock, such as floats, decking, railing or awning systems.
(4) Both engineered plans and manufacturer's
certified plans shall be based upon the actual conditions at the site of the
proposed boat dock.
B.
Persons seeking approval for a boat dock are required to obtain a permit or
written approval for the proposed boat dock from other entities with authority
over the lake or body of water on which the proposed boat dock will be
constructed or the land to which any part of the boat dock will be affixed.
(1) Persons seeking approval for a boat dock
are responsible for determining what, if any, such permits or approvals are
required, and for obtaining the permits or approvals.
(2) The division shall condition approval of
the project plans for the boat dock upon receipt of proof that the person has
received such other permits or approvals required to construct the boat
dock.
C. During
construction of a boat dock, a complete set of all permits and approvals
required for construction of the boat dock shall be posted in a readily visible
location at or adjacent to the construction site, and one complete set of the
approved plans shall be kept available at the construction site.
D. Construction of a boat dock shall be
completed within six months of the date that the permitting entity approves the
permit.
E. After a boat dock is
completed, an RPE shall submit to the division a signed and sealed
certification that it was built in accordance with the requirements set forth
in 18.17.3 NMAC; the plans submitted to and approved by the division and any
entity issuing a permit or approval for construction of the boat dock; and,
with any special conditions or requirements imposed by the this division or any
entity issuing a permit or approval for the construction of a boat
dock.
F. The number shown on an
approved permit shall be permanently affixed to the end of boat dock facing the
lake using reflective numbers and letters three inches in height, and of a
color contrasting with the background. Example: UT-00-001.