N.M. Admin. Code § 18.21.3.15 - PROCEDURES TO BE FOLLOWED BY THE DEPARTMENT
A. Eligibility of funds: Federal funds may be
eligible to participate in the cost and erection of these panels in the same
manner that such funds are eligible for other highway signs to the national
highway system, except that federal funds are not eligible to participate in
the cost of procuring and installing the business signs.
B. Programming, project authorization and
other actions: The procedures for obtaining approval for programming, project
authorizations and other actions for federal projects including these panels
shall follow the same procedures in use for other national highway system
projects. If the department desires to erect these panels on the interstate
highway system or other controlled access routes on the national highway system
without federal fund participation, it shall provide a design consistent with
standards in the MUTCD and standards herein. No panels shall be approved which
do not conform to the requirements of these standards. Programming of a
traveler informational panel project shall be at the discretion of the
department and/or, when applicable, the program manager/contractor.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.