N.M. Admin. Code § 18.31.2.9 - GRANT APPLICATION/ACCEPTANCE PROCEDURES FOR PROPOSED SCENIC BYWAY PROJECT
A.
Prescreening: The project sponsor should prescreen the project grant
application to assure that it meets the basic requirements. Applications should
be formatted as outlined in this document. The Coordinator may be contacted for
assistance.
B. Types of projects
eligible for Federal assistance with Scenic Byway grants:
(1) Planning, design, and development of
State scenic byways programs.
(2)
Safety improvements to a highway designated as a scenic byway to the extent
such improvements are necessary to accommodate increased traffic and changes in
the types of vehicles using the highway due to such designation.
(3) Construction along the scenic byway of
facilities for the use of pedestrians and bicyclists, rest areas, turnouts,
highway shoulder improvements, passing lanes, overlooks, and interpretive
facilities.
(4) Improvements to the
scenic byway that will enhance access to an area for the purpose of recreation,
including water-related recreation.
(5) Protecting historical, archeological, and
cultural resources in areas adjacent to the highways.
(6) Developing and providing tourist
information to the public, including interpretive information about the scenic
byway.
C. Basic
Requirements for a Grant Application:
(1) To
be eligible to apply for a grant, the route must be designated as a State
scenic byway under this program prior to the annual grant-funding
cycle.
(2) The minimum grant
request that will be considered is $10,000. The maximum grant that will be
considered is $1,000,000 for a single state project. Projects sponsored by
multiple states may be up to $1,000,000 per supporting state.
(3) National Environmental Policy Act (NEPA)
compliance is the financial responsibility of the sponsor and is not eligible
for grant funding. NEPA should be substantially complete at the time of
application. Maintenance is not an eligible activity.
(4) The public must have a legal right to
access the project.
(5) The federal
share payable for the costs of carrying out projects and developing programs is
80%. The sponsor must secure 20% non-federal matching funds. Only cash or
donations of land as described in USC Title 23, Section 323, are considered an
allowable match for this criteria.
(6) The RPO or MPO must concur with the
project grant application before forwarding it to the Coordinator. The project
should be compatible with adjacent land uses.
D. Evaluation and Statewide Ranking of
Project Grant Applications - The Coordinator will present the grant
applications for consideration at a scheduled SHBAC meeting. The SHBAC will
serve as a technical review committee, evaluating each proposal on criteria
outlined in Appendix 3 of this document, and establish a statewide ranking for
the projects. The SHBAC may choose to limit the number of projects it reviews
if the quantity is too numerous. Therefore a sponsor submitting more than one
application must prioritize their submittals. If necessary, the SHBAC may ask
the RPO to screen submittals.
E.
Concurrence - Projects approved by the SHBAC will be forwarded to the SHC for
final concurrence. A list of those approved by the SHC will be forwarded to the
appropriate RPOs or MPOs to prioritize and incorporate into the regional
transportation improvement plan (RTIP).
F. Submittal of Grant Applications to FHWA -
Approved grant applications are forwarded by the Coordinator to the FHWA
division office with a state budget summary sheet.