N.M. Admin. Code § 19.11.4.11 - BLOWOUT PREVENTION

The permittee shall take all necessary precautions to always keep wells under operational control and mechanical integrity. The permittee shall install BOPE, capable of shutting in the well during any operation, on the surface casing and always maintained ready for use. If necessary, the permittee shall equip the BOPE to be remotely activated. The equipment shall be rated for operating at pressures and temperatures exceeding the maximum pressure and temperature anticipated for the well.

Notes

N.M. Admin. Code § 19.11.4.11
Adopted by New Mexico Register, Volume XXIX, Issue 04, February 27, 2018, eff. 2/27/2018

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.