N.M. Admin. Code § 19.15.36.17 - SPECIFIC REQUIREMENTS APPLICABLE TO EVAPORATION, STORAGE, TREATMENT AND SKIMMER PONDS
A. Engineering
design plan. An applicant for a surface waste management facility permit or
modification requesting inclusion of a skimmer pit; an evaporation, storage or
treatment pond; or a below-grade tank shall submit with the surface waste
management facility permit application a detailed engineering design plan,
certified by a registered profession engineer, including operating and
maintenance procedures; a closure plan; and a hydrologic report that provides
sufficient information and detail on the site's topography, soils, geology,
surface hydrology and ground water hydrology to enable the division to evaluate
the actual and potential effects on soils, surface water and ground water. The
plan shall include detailed information on dike protection and structural
integrity; leak detection, including an adequate fluid collection and removal
system; liner specifications and compatibility; freeboard and overtopping
prevention; prevention of nuisance and hazardous odors such as H2S; an
emergency response plan, unless the pit is part of a surface waste management
facility that has an integrated contingency plan; type of oil field waste
stream, including chemical analysis; climatological factors, including
freeze-thaw cycles; a monitoring and inspection plan; erosion control; and
other pertinent information the division requests.
B. Construction, standards.
(1) In general. The operator shall ensure
each pit, pond and below-grade tank is designed, constructed and operated so as
to contain liquids and solids in a manner that will protect fresh water, public
health and the environment.
(2)
Liners required. Each pit or pond shall contain, at a minimum, a primary
(upper) liner and a secondary (lower) liner with a leak detection system
appropriate to the site's conditions.
(3) Liner specifications. Liners shall
consist of a 30-mil flexible PVC or 60-mil HDPE liner, or an equivalent liner
approved by the division. Synthetic (geomembrane) liners shall have a hydraulic
conductivity no greater than 1 x 10-9 cm/sec.
Geomembrane liners shall be composed of an impervious, synthetic material that
is resistant to petroleum hydrocarbons, salts and acidic and alkaline
solutions. Liner materials shall be resistant to ultraviolet light, or the
operator shall make provisions to protect the material from sunlight. Liner
compatibility shall comply with EPA SW-846 method 9090A.
(4) Alternative liner media. The division may
approve other liner media if the operator demonstrates to the division's
satisfaction that the alternative liner protects fresh water, public health and
the environment as effectively as the specified media.
(5) Each pit or pond shall have a properly
constructed foundation or firm, unyielding base, smooth and free of rocks,
debris, sharp edges or irregularities, in order to prevent rupture or tear of
the liner and an adequate anchor trench; and shall be constructed so that the
inside grade of the levee is no steeper than 2H:1V. Levees shall have an
outside grade no steeper than 3H:1V. The levees' tops shall be wide enough to
install an anchor trench and provide adequate room for inspection and
maintenance. The operator shall minimize liner seams and orient them up and
down, not across a slope. The operator shall use factory seams where possible.
The operator shall ensure field seams in geosynthetic material are thermally
seamed (hot wedge) with a double track weld to create an air pocket for
non-destructive air channel testing. A stabilized air pressure of 35 psi, plus
or minus one percent, shall be maintained for at least five minutes. The
operator shall overlap liners four to six inches before seaming, and orient
seams parallel to the line of maximum slope, i.e., oriented along, not across,
the slope. The operator shall minimize the number of field seams in corners and
irregularly shaped areas. There shall be no horizontal seams within five feet
of the slope's toe. Qualified personnel shall perform field seaming.
(6) At a point of discharge into or suction
from the lined pit, the liner shall be protected from excessive hydrostatic
force or mechanical damage, and external discharge lines shall not penetrate
the liner.
(7) Primary liners shall
be constructed of a synthetic material.
(8) A secondary liner may be a synthetic
liner or an alternative liner approved by the division. Secondary liners
constructed with compacted soil membranes, i.e., natural or processed clay and
other soils, shall be at least three feet thick, placed in six-inch lifts and
compacted to ninety-five percent of the material's standard proctor density, or
equivalent. Compacted soil membranes used in a liner shall undergo permeability
testing in conformity with ASTM standards and methods approved by the division
before and after construction. Compacted soil membranes shall have a hydraulic
conductivity of no greater than 1 x 10-8 cm/sec. The
operator shall submit results of pre-construction testing to the division for
approval prior to construction.
(9)
The operator shall place a leak detection system between the lower and upper
geomembrane liners that consists of two feet of compacted soil with a saturated
hydraulic conductivity of 1 x 10-5 cm/sec or greater
to facilitate drainage. The leak detection system shall consist of a properly
designed drainage and collection and removal system placed above the lower
geomembrane liner in depressions and sloped so as to facilitate the earliest
possible leak detection. Piping used shall be designed to withstand chemical
attack from oil field waste or leachate; structural loading from stresses and
disturbances from overlying oil field waste, cover materials, equipment
operation or expansion or contraction; and to facilitate clean-out maintenance.
The material placed between the pipes and laterals shall be sufficiently
permeable to allow the transport of fluids to the drainage pipe. The slope of
the interior sub-grade and of drainage lines and laterals shall be at least a
two percent grade, i.e., two feet vertical drop per 100 horizontal feet. The
piping collection system shall be comprised of solid and perforated pipe having
a minimum diameter of four inches and a minimum wall thickness of schedule 80.
The operator shall seal a solid sidewall riser pipe to convey collected fluids
to a collection, observation and disposal system located outside the perimeter
of the pit or pond. The operator may install alternative methods as approved by
the division.
(10) The operator
shall notify the division at least 72 hours prior to the primary liner's
installation so that a division representative may inspect the leak detection
system before it is covered.
(11)
The operator shall construct pits and ponds in a manner that prevents
overtopping due to wave action or rainfall, and maintain a three foot freeboard
at all times.
(12) The maximum size
of an evaporation or storage pond shall not exceed 10 acre-feet.
C. Operating standards.
(1) The operator shall ensure that only
produced fluids or non-hazardous waste are discharged into or stored in a pit
or pond; and that no measurable or visible oil layer is allowed to accumulate
or remain anywhere on a pit's surface except an approved skimmer pit.
(2) The operator shall monitor leak detection
systems pursuant to the approved surface waste management facility permit
conditions, maintain monitoring records in a form readily accessible for
division inspection and report discovery of liquids in the leak detection
system to the division within 24 hours.
(3) Fencing and netting. The operator shall
fence or enclose pits or ponds to prevent unauthorized access and maintain
fences in good repair. Fences are not required if there is an adequate
perimeter fence surrounding the surface waste management facility. The operator
shall screen, net, cover or otherwise render non-hazardous to migratory birds
tanks exceeding eight feet in diameter and exposed pits and ponds. Upon written
application, the division may grant an exception to screening, netting or
covering requirements upon the operator's showing that an alternative method
will adequately protect migratory birds or that the tank or pit is not
hazardous to migratory birds.
(4)
The division may approve spray systems to enhance natural evaporation. The
operator shall submit engineering designs for spray systems to the division's
environmental bureau for approval prior to installation. The operator shall
ensure that spray evaporation systems are operated so that spray-borne
suspended or dissolved solids remain within the perimeter of the pond's lined
portion.
(5) The operator shall use
skimmer pits or tanks to separate oil from produced water prior to water
discharge into a pond. The operator shall install a trap device in connected
ponds to prevent solids and oils from transferring from one pond to another
unless approved in the surface waste management facility permit.
D. Below-grade tanks and sumps.
(1) The operator shall construct below-grade
tanks with secondary containment and leak detection. The operator shall not
allow below-grade tanks to overflow. The operator shall install only
below-grade tanks of materials resistant to the tank's particular contents and
to damage from sunlight.
(2) The
operator shall test sumps' integrity annually, and shall promptly repair or
replace a sump that does not demonstrate integrity. The operator may test sumps
that can be removed from their emplacements by visual inspection. The operator
shall test other sumps by appropriate mechanical means. The operator shall
maintain records of sump inspection and testing and make such records available
for division inspection.
E. Closure required. The operator shall
properly close pits, ponds and below-grade tanks within six months after
cessation of use.