N.M. Admin. Code § 19.8.20.2068 - SUBSIDENCE CONTROL: PUBLIC NOTICE
The mining schedule shall be distributed by mail to all owners of property and residents residing within the permit area above the underground workings and adjacent areas. Each such person shall be notified by mail at least six months prior to mining beneath his property or residence. The notification shall contain, at a minimum:
A. identification of specific areas in which
mining will take place;
B. dates
that specific areas will be undermined; and
C. the location or locations where the
operator's subsidence control plan may be examined.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.