N.M. Admin. Code § 19.8.21.2102 - ADDITIONAL PERFORMANCE STANDARDS
In addition to the requirements of 19.8.20 NMAC, each person who conducts combined surface and underground mining operations shall comply with the following:
A. A 500-foot
barrier pillar of coal shall be maintained between the surface and underground
mining activities in any one seam. The director and the mine safety and health
administration, and the state mine inspector, may, however, approve a lesser
distance, after finding by the director that mining at a lesser distance will
result in:
(1) improved coal resources
recovery;
(2) abatement of water
pollution; or
(3) elimination of
hazards to the health and safety of the public.
B. The vertical distance between combined
surface and underground mining activities working separate seams shall be
sufficient to provide for the health and safety of the workers and to prevent
surface water from entering the underground workings.
C. No combined activities shall reduce the
protection provided public health and safety below the level of protection
required for those activities if conducted without a
variance.