N.M. Admin. Code § 19.8.9.902 - OPERATION PLAN: BLASTING
Each application shall contain a blasting plan for the proposed permit area, explaining how the applicant intends to comply with the requirements of 19.8.20.2028 through 2033 NMAC and including the following:
A. types and approximate
amounts of explosive to be used for each type of blasting operation to be
conducted;
B. description of
procedures and plans for recording and retention of information on the
following during blasting:
(1) drilling
patterns, including size, number, depths, and spacing of holes;
(2) charge and packing of holes;
(3) types of fuses and detonation controls;
and
(4) sequence and timing of
firing holes;
C.
description of blasting warning and site access control equipment and
procedures;
D. description of types,
capabilities, sensitivities, and locations of use of any blast monitoring
equipment and procedures proposed to be used;
E. description of plans for recording and
reporting to the director the results of preblasting surveys, if required;
and
F. description of unavoidable
hazardous conditions for which deviations from the blasting schedule will be
needed under Paragraph (3) of Subsection A of
19.8.20.2030
NMAC.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.