N.M. Admin. Code § 20.6.2.3114 - FEES
|
20.6.2.3114 TABLE 1 (gpd=gallons per day) |
Permit Fee |
|
Agriculture <10,000 gpd |
$ 1,150 |
|
Agriculture 10,000 to 49,999 gpd |
$ 2,300 |
|
Agriculture 50,000 to 99,999 gpd |
$ 3,450 |
|
Agriculture 100,000 gpd or greater |
$ 4,600 |
|
Domestic Waste <10,000 gpd |
$ 1,150 |
|
Domestic Waste 10,000 to 49,999 gpd |
$ 2,300 |
|
Domestic Waste 50,000 to 99,999 gpd |
$ 3,450 |
|
Domestic Waste 100,000 to 999,999 gpd |
$ 4,600 |
|
Domestic Waste 1,000,000 to 9,999,999 gpd |
$ 7,000 |
|
Domestic Waste 10,000,000 gpd or greater |
$ 9,200 |
|
Food Processing <10,000 gpd |
$ 1,150 |
|
Food Processing 10,000 to 49,999 gpd |
$ 2,300 |
|
Food Processing 50,000 to 99,999 gpd |
$ 3,450 |
|
Food Processing 100,000 to 999,999 gpd |
$ 4,600 |
|
Food Processing 1,000,000 or greater |
$ 7,000 |
|
Grease/Septage surface disposal <10,000 gpd |
$ 1,725 |
|
Grease/Septage surface disposal 10,000 gpd or greater |
$ 3,450 |
|
Industrial <10,000 gpd; or <10,000 yd3 of contaminated solids |
$ 1,725 |
|
Industrial 10,000 to 99,999 gpd; or 10,000 to 99,999 yd3 of contaminated solids |
$ 3,450 |
|
Industrial 100,000 to 999,999 gpd; or 100,000 to 999,999 yd3 of contaminated solids or greater |
$ 6,900 |
|
Industrial 1,000,000 gpd or greater; or 1,000,000 yd3 of contaminated solids or greater |
$10,350 |
|
Discharge of remediation system effluent - remediation plan approved under separate regulatory authority |
$ 1,600 |
|
Mining dewatering |
$ 3,250 |
|
Mining leach dump |
$13,000 |
|
Mining tailings |
$13,000 |
|
Mining waste rock |
$13,000 |
|
Mining in-situ leach (except salt) and old stope leaching |
$13,000 |
|
Mining other (mines with minimal environmental impact, post closure operation and maintenance, evaporation lagoons and land application at uranium mines) |
$ 4,750 |
|
Gas Compressor Stations 0 to 1000 Horsepower |
$ 400 |
|
Gas Compressor Stations >1001 Horsepower |
$ 1,700 |
|
Gas Processing Plants |
$ 4,000 |
|
Injection Wells: Class I (non-hazardous) |
$ 4,500 |
|
Injection Wells: Class III and Geothermal |
$ 1,700 |
|
Oil and Gas Service Companies |
$ 1,700 |
|
Refineries |
$ 8,400 |
|
Crude Pump Station |
$ 1,200 |
|
Underground Gas Storage |
$ 1,700 |
|
Abatement of ground water and vadose zone contamination |
$ 2,600 |
|
General permit |
$ 600 |
|
20.6.2.3114 Table 2 |
Fee Amount |
|
|
Filing fee |
$100 |
|
|
Temporary permission |
$50 |
|
|
Financial assurance: approval of instrument |
greater of $250 or .01% |
|
|
Financial assurance: annual review |
greater of $100 or .001% |
|
Notes