N.M. Admin. Code § 20.6.4.206 - PECOS RIVER BASIN
Perennial reaches of the Rio Felix and perennial reaches of tributaries to the Rio Hondo downstream of Bonney canyon, excluding North Spring river.
A.
Designated uses: irrigation, livestock watering, wildlife habitat, secondary contact and warmwater aquatic life.
B.
Criteria:
(1) The use-specific numeric criteria set forth in 20.6.4.900 NMAC are applicable to the designated uses.
(2) At all flows above 50 cfs: TDS 14,000 mg/L or less, sulfate 3,000 mg/L or less and chloride 6,000 mg/L or less.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.