N.Y. Comp. Codes R. & Regs. Tit. 5 § 70.14 - General conditions of program assistance
(a) Use of proceeds. The program recipient
must use the program assistance, to finance the implementation of the project
or the feasibility study approved by the department.
(b) Completion of work. A feasibility study
or project which receives program assistance must be completed within one year
after the funding award date or loan closing. The department may extend this
period on a case-by-case basis where the program recipient has demonstrated
reasonable cause for the delay.
(c)
Certificate of completion. Within 45 days of completion of the project, the
program recipient must provide the department with a certificate of completion,
signed by the program recipient and the contractor, certifying that the project
was completed in accordance with the descriptions and cost estimates provided
to the department.
(d) Changes in
scope of work. The program recipient shall promptly provide written notice to
the department of any necessary changes in a project which differ from the
program application submitted to the department, and no such changes in the
scope of work shall occur unless approved in writing by the
department.
(e) Change in project
cost. The program recipient shall promptly provide written notice to the
department of any change in the cost of a project which differs by either more
than 10 percent or $20,000 from the selected contractor's cost estimate, or the
program recipient schedules and selected estimate in the case of an in-house
project, submitted to the department, and a justification therefor. No such
change in project costs shall occur unless approved in writing by the
department; provided, however, that under no circumstances will program
assistance be available for an amount exceeding the cost of the
project.
(f) Site inspection. The
program recipient must provide the department, or its designated agents, with
reasonable access to the project site before, during, and after the
construction phase of the project in order to monitor and inspect the work
being undertaken with program assistance.
(g) Applicable laws and permits. The program
recipient performs all work in compliance with all applicable Federal, State,
and local laws, rules and regulations. Prior to the commencement of work, the
program recipient must obtain all permits, certificates and approvals which may
be required in connection with the performance and completion of the
work.
(h) Documentation of work.
The program recipient must retain for a period of six years after the date of
closing on the loan all cancelled checks, receipts and contracts used in
connection with the work on the project, and must produce them at the request
of the department for the purpose of verifying the cost of the
project.
(i) Reimbursement for
failure to comply. If the program recipient fails to comply with the
requirements of this Part, the program recipient may be disqualified from
participating in the program, program assistance may be rescinded, and the
applicant may be required to reimburse the department for all or a portion of
the program assistance which the department has advanced.
(j) Removal of project from New York State.
Immediate repayment of all program assistance, plus interest and a penalty
equal to 50 percent of the principal amount of the program assistance, will be
required if all or any portion of a building, fixtures, machinery or equipment
funded through a project is transferred out of New York State, prior to the
expiration of the useful life of the building, fixtures, machinery or
equipment. The useful life shall be negotiated between the applicant and the
department prior to execution of the program assistance agreement.