Ohio Admin. Code 1301:3-5-07 - Inspection of power boilers and process boilers
(A) All power boilers and high pressure, high
temperature boilers and their appurtenances shall be thoroughly inspected, internally and externally, under operating
conditions at intervals of not more than one year, unless approved for biennial
inspection under section
4104.13 of the Revised
Code.
(B) Process boilers and
their appurtenances shall be thoroughly inspected, internally and externally,
and under
operating conditions at intervals of not more than three years, unless approved for quinquennial inspection under
section 4104.13 of the Revised
Code,
.
and
Process boilers
and their appurtenances shall not be operated at pressures in excess of
the safe working pressure stated in the certificate of operation in accordance
with sections 4104.12,
4104.13, and
4104.15 of the Revised
Code.
(C) A boiler owner or user
may request that a boiler be inspected biennially, triennially, or quinquennially by making a written request to the
superintendent for an extended inspection period. On approval of an application
for an extended inspection period by the superintendent, the expiration date of
the current certificate of operation shall be extended for a period consistent
with the approval. Subsequent certificates shall be issued to expire
biennially, triennially, or
quinquennially
in the same intervals as the
extended inspection period approved by the superintendent, unless
withdrawn by the superintendent
withdraws such approval., The application shall contain, in sufficient
detail, the following pertinent information:
(1) Use of boiler;
(2) Boiler data, name of manufacturer, and
all identifying numbers;
(3) Name,
registration number, and pertinent qualifications of the professional engineer
in charge of water treatment;
(4)
Laboratory facilities for testing and analyzing boiler water;
(5) Method and frequency of sampling
water;
(6) Percentage of make-up
water;
(7) Record of boiler outages
occurring since the last internal inspection; and
(8) A report from a special or general
inspector relative to
regarding the acceptability of the boiler for
biennial, triennial, or quinquennial inspection.
Notes
Promulgated Under: 119.03
Statutory Authority: 4104.06
Rule Amplifies: 4104.06, 4104.13
Prior Effective Dates: 01/01/1997, 10/13/2005, 11/07/2014