Ohio Admin. Code 1501:13-9-03 - Topsoil handling
(A) To prevent topsoil from being
contaminated by spoil or waste materials or otherwise wasted, the
permittee or operator shall remove the topsoil as
a separate operation from areas to be disturbed. Topsoil shall be immediately
redistributed according to the requirements of paragraph (C) of this rule on
areas graded to the approved postmining configuration. The topsoil shall be
segregated, stockpiled, and protected from wind and water erosion and from
contaminants which lessen its capability to support vegetation if sufficient
graded areas are not immediately available for redistribution. Areas of surplus
soil materials may be identified for use in future reclamation.
(B) Topsoil to be salvaged shall be removed
before any drilling for blasting, mining, spoil or other surface disturbance.
(1) All topsoil shall be removed and if the
topsoil is less than six inches, a six-inch layer that includes the topsoil and
the unconsolidated materials immediately below the "A" horizon shall be removed
and segregated for resoiling, unless an alternative material is approved by the
chief of the division of mineral resources
management in accordance with paragraph (B)(3) of this rule.
(2) Where necessary to obtain soil
productivity consistent with postmining land use, the chief
of the division of mineral resources
management may require that the subsoil be segregated and replaced
prior to the redistribution of the topsoil.
(3) Alternative resoiling materials may be
used instead of, or as a supplement to, topsoil where the resulting soil medium
is equal to or more suitable for vegetation or if the topsoil is of
insufficient quantity or quality for sustaining vegetation and if all the
following requirements are met:
(a) The
operator
applicant
or permittee demonstrates that the alternative resoiling materials, or an
overburden topsoil mixture is more suitable for restoring land capability and
productivity by the results of chemical and physical analyses. These analyses
shall include determinations of pH, per cent organic material, phosphorus,
potassium, and texture class, and such other analyses as required by the chief
of the division of mineral resources
management. The chief of the division of
mineral resources management may require the results of field-site
trials or greenhouse tests be used to demonstrate the feasibility of using such
alternative resoiling;
(b) The
chemical and physical analysis and the results of field-site trials and
greenhouse tests are accompanied by a certification from a qualified soil
scientist or agronomist; and
(c) If alternative resoiling materials are
used, such materials are removed, segregated, and replaced in conformance with
this rule.
(4) If there
is insufficient topsoil on the permit area, the applicant
or permittee shall:
(a) Identify the alternative resoiling
materials to be used for resoiling;
(b) Submit the results of the analysis
required by paragraph (B)(3)(a) of this rule;
(c) Submit certification by a qualified soil
scientist or agronomist that the alternative resoiling materials are suitable
for establishing the permanent vegetative species proposed by the applicant in
his
the mining
and reclamation plans
plan; and
(d) If alternative resoiling materials are to
be used, submit a plan, where appropriate, for
the removal, segregation, and replacement of such materials.
(5) Limits on topsoil removal
area. Where the removal of vegetation materials, topsoil, or other materials
may result in erosion which may cause air or water pollution:
(a) The size of the area from which topsoil
is removed at any one time shall be limited;
(b) The surface soil layer shall be
redistributed at a time when the physical and chemical properties of topsoil
can be protected and erosion can be minimized; and
(c) Such other measures shall be taken as the
regulatory authority
chief may approve or require to control erosion.
(6)
The chief may choose not to require the removal of
topsoil for minor disturbances which:
(a)
Occur at the
site of small structures, such as power poles, signs, or fence lines; or
(b)
Will
not destroy the existing vegetation and will not cause erosion.
(C)
Final grading and replacement of topsoil. Final grading
shall follow the completion of backfilling and rough grading within a time that
will allow replacement of topsoil or approved resoiling materials to begin and
be completed during either the current normal period for favorable planting or
at the start of the first appropriate normal period for favorable planting
following final grading, whichever occurs first. After final grading and
before the topsoil or approved alternative resoiling materials are replaced,
regraded land shall be scarified or otherwise treated to eliminate slippage
surfaces and to promote root penetration. Resoiling
shall begin, continue reasonably uninterrupted, and be completed prior to the
end of the normal period for favorable planting unless the permittee receives
an extension of the time limit because of climatic conditions in accordance
with paragraph (D) of this rule.Topsoil, or approved alternative resoiling materials shall
be redistributed in a manner that:
(1)
Achieves an approximate
approximately uniform,
stable thickness when consistent with the
postmining land uses
use, contours, and surface-water drainage systems. Soil
thickness may also be varied to the extent such variations help meet the
specific revegetation goals identified in the permit;
(2) Prevents excess compaction of the spoil
and topsoil; and
(3) Protects from
wind and water erosion before and after seeding and planting.
(D) If resoiling and protection of
that resoiling cannot reasonably be done within a prescribed time limit because
of climatic conditions existing at that time of the year, the permittee may
apply to the chief for an extension of the time limit and the chief shall not
issue a notice under paragraph (A) of rule
1501:13-7-06
of the Administrative Code during such time extension.
(E) If the permit allows storage of topsoil
or approved alternative resoiling materials, such materials shall be placed on
a stable area within the permit area where it will not be disturbed or exposed
to excessive water, wind erosion, unnecessary compaction and contamination by
undesirable materials. Stockpiled materials shall be protected from wind and
water erosion, unnecessary compaction, and contaminants either by: an effective
cover of non-noxious, quick-growing annual and perennial plants, seeded or
planted during the first normal period after removal for favorable planting
conditions; or other methods demonstrated and approved by the chief to provide
equal protection. Unless approved by the chief, stockpiled topsoil or approved
alternative resoiling materials shall not be moved until required for
redistribution on a disturbed area.
(F) Nutrients and soil amendments in the
amounts and analysis as determined by soil tests taken in accordance with
agronomically acceptable practices shall be applied to the surface soil layer
so that it will support the postmining requirements of rule
1501:13-9-17
of the Administrative Code and the revegetation requirements of rule
1501:13-9-15 of the
Administrative Code.
Notes
Promulgated Under: 119.03
Statutory Authority: 1513.02
Rule Amplifies: 1513.16
Prior Effective Dates: 8/28/78, 5/1/80, 8/16/82 (Emer.), 10/27/82, 8/5/91, 07/28/05
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.