Except as provided in paragraph (C) of this rule, the following
are to be included in each application for a permit that proposes to
dewater:
(A) A hydrologic map
consisting of a single map using the most recent USGS 7.5 minute topographic
maps at a scale of 1:24,000 as a base or other approved format showing all of
the following:
(1) The proposed permit
area;
(2) A line identifying the
area encompassing a four mile radius from the boundary of the proposed permit
area, to be known as the hydrologic study area;
(3) The location of the cross-sections
required under paragraph (B)(5) of this rule;
(4) The location of the selected water supply
wells identified in paragraph (B)(4)(a) of this rule and other water sources
used for domestic, agricultural, or industrial use including an assigned
identification number; and
(5) Any
well, well field, reservoir, river, water source used for a public water supply
or facility registered under section
1521.16 of the Revised Code on
or within the hydrologic study area.
(6)
The chief may
require additional
Additional information
within or beyond the hydrologic study area be shown on the map if such
identification is necessary based on site-specific conditions.
(B) A hydrogeologic description in
sufficient detail to determine the hydrologic cone of depression for the
proposed operation
.
, which:
(1)
The description shall include
Includes a general statement of the geology within the
proposed permit and hydrologic study area down to and including the deeper of
either the first stratigraphic unit below the lowest mineral deposit to be
mined or any aquifer below the lowest mineral deposit to be mined.
It shall also include
Additionally, the areal and structural geology of
the permit and hydrologic study area, and other parameters which may affect the
occurrence, availability, movement, quantity, and quality of potentially
affected ground waters and shall
are to be included. The general statement will be
based on information available to the applicant from test borings, core
drillings, well logs, and geologic literature and practices.
(2)
The
description shall contain
Contains
information available in the public domain related to the ground water
hydrology for the proposed permit and hydrologic study area, including, at a
minimum:
(a) The elevation and the horizontal
extent of the aquifer(s), intervening lithology, and overburden;
(b) The lithology and thickness of the
aquifer(s);
(c) Known uses of the
water in the aquifer(s);
(d) The
elevation of water in the mineral deposit(s), and each water-bearing stratum
above and below the mineral deposit;
(e) The transmissivity of the
aquifer(s);
(f) The storativity of
the aquifer(s);
(g) The hydraulic
conductivity of the aquifer(s);
(h)
The specific yield of unconfined aquifer(s);
(i) The location and elevation of any
existing dewatering sumps (including state plane coordinates and North American
datum (NAD) year); and
(j) The rate
of discharge of any currently registered water withdrawals shown pursuant to
paragraph (A)(5) of this rule.
(3)
The
description shall include
Includes a
listing of the published information and data used in preparation of the items
in paragraphs (B)(1) and (B)(2) of this rule, and copies of the unpublished
records and data used in preparation of these items including, but not limited
to, core descriptions, cutting descriptions, stratigraphic descriptions, and
pump or slug test records.
(4)
The description shall contain
Contains a water supply inventory, representing all
aquifers
. The inventory shall be submitted
in a format prescribed by the chief
, and shall
include,
including, at a minimum:
(a) A listing of water sources in the
proposed permit and hydrologic study area as shown pursuant to paragraphs
(A)(4) and (A)(5) of this rule. The representative water sources selected
shall be chosen
are to include recently drilled wells, represent all
aquifers and producing zones within the aquifers, and reflect a uniform
geographical distribution of wells within the study area. The inventory
shall include
information also includes: all of the existing water
wells if there are fewer than one hundred wells
or,
if. If there are more than one
hundred wells within the study area
, the inventory shall include one hundred wells plus
twenty-five per cent of those wells in excess of one hundred but
shall not exceed
not
more than a total of three hundred.
The
listing shall include to the extent available the:
For each water well, include a list of the following:
(i) Map identification number assigned under
paragraph (A)(4) of this rule;
(ii)
Ohio department of natural resources, division of water resources number
assigned to the log form required to be
filed under section 1521.05 of the Revised
Code;
(iii) Township;
(iv) Year drilled;
(v) State plane coordinates (including NAD
year);
(vi) Surface elevation of
the well (feet);
(vii) Total depth
of the well in feet below the land surface;
(viii) Depth to bedrock (feet);
(ix) Description of unconsolidated
material;
(x) Static water level of
the well in feet below the land surface;
(xi) Casing length (feet);
(xii) Lithology of the screen interval/open
borehole;
(xiii) Length of any well
screen (feet);
(xiv) Test rate
(gallons per minute);
(xv) Duration
of test; and
(xvi) Drawdown
(feet);
(b) A listing of
the location and type of any public water supply sources on the permit and
within the hydrologic study area; and
(c) A copy of the division of water resources
well logs for the selected wells.
(d) An applicant may, prior to submission of
an application, request in writing, a reduction of the number and/or extent of
the submittals required
set forth in paragraph (B)(4) of this rule. The
request may be granted only if the chief makes a written determination that
this reduction will not diminish the level of accuracy in the ground water
model. If there is a disagreement as to the amount or extent of the water
resources information necessary, the chief shall
will consult
with the chief of the division of water resources prior to determining the
final extent of data necessary. If the chief grants a reduction, the written
request and determination shall
are to be submitted with the permit
application.
(5)
The application shall contain
Contains a minimum of two perpendicular hydrogeologic
cross-sections of the same scale for the study area based on available
information
and
which at a minimum
shall:
(a)
Be
Are of
uniform horizontal scale;
(b)
Be
Are of
uniform vertical scale;
(c) Depict
the information required
set forth in paragraphs (B)(2)(a), (B)(2)(b),
(B)(2)(d), and (B)(2)(i) of this rule;
(d) Intersect the center of the proposed
operation; and
(e) Include the data
points used to construct the cross section.
(6) Where information
required
to be
included in the water supply inventory of paragraph (B)(4) of this rule
is unobtainable, the application is to include a
statement to that effect shall be
submitted, giving the reasons therefor.
(C) Ground water model submitted by the
applicant.
An applicant for a permit may choose to submit a ground water
model with his or her
their application for a
permit that defines the projected cone of depression for the proposed
operation.
,
accurately reflects
The model must accurately
reflect the ground water flow conditions associated with the
hydrologic study area, and
be
is
consistent with ASTM international standards. The website for ASTM
international is http://www.astm.org/.
The submission shall include detailed
Detailed explanations of the hydrologic and geologic
parameters used to construct the model are to be
included in the submission and the
model results must be submitted in a format
prescribed by the chief.
A ground water model submitted to the chief
must
is to be
a three-dimensional ground water flow model utilizing finite difference
modeling software such as MODFLOW. MODFLOW is available from the U.S.
geological survey at the website
http://water.usgs.gov/nrp/gwsoftware/modflow.html.
An applicant may request the chief to accept a two-dimensional ground water
flow model using finite difference software, provided the chief determines,
based on written justification submitted with the request, that the model will
accurately represent the ground water flow in the hydrologic study area.
(D) Staging of the projected cone
of depression.
(1) An applicant for a permit
may request the chief to establish the projected cone of depression in stages
to reflect the development of the dewatering operations over the life of the
proposed permit. Such staged cone of depression shall
will reflect a
maximum of four vertical or horizontal sump locations within the proposed
permit area. For each stage, the applicant shall
is to identify
the sump location and elevation and the part of the permit to be
dewatered.
(2) If the applicant
submits a staged ground water model under paragraph (C) of this rule, the
projected cones of depression shall
are to be depicted on the map(s) submitted under
paragraph (A) of this rule. The responsibility for water replacement within the
cone of depression provided in division (B) of section
1514.13 of the Revised Code will
be based on the cones of depression established by the chief at the time of
permit issuance. For the purposes of division (B) of section
1514.13 of the Revised Code,
where horizontal staging of the cone of depression is accepted for a proposed
permit area, the cone of depression applied to water replacement
responsibilities will be based on the cumulative boundary of the cones of
depression of the permit area affected at the time of the complaint.
(3) If the projected cone of depression is
staged, the permittee must
applicant is to identify the exact location,
elevation, and pumping rate of the dewatering sump(s) for the surface mining
operation on each annual map required
submitted under section
1514.03 of the Revised Code. The
permittee must
applicant is to notify the chief in writing at least
sixty days prior to altering the horizontal or vertical location of the
dewatering sump.
(E) For
applications that include a ground water model submitted under paragraph (C) of
this rule and meet all other permit requirements of Chapter 1514. of the
Revised Code, the chief may issue a surface mining permit conditioned on final
review and approval of the ground water model, provided the applicant submits a
ground water model pursuant to paragraph (C) of this rule that also contains a
preliminary regulatory ten- foot cone of depression map based upon guidelines
established by the chief. The permittee shall comply with the final cone of