(A)
Purpose. The
sponsored programs office ("sponsored programs") resides in the division of
research and sponsored programs and, together with grants accounting in the
controller's office, is responsible for stewardship of external funds received
for sponsored projects. Sponsored programs oversees submission of proposals to
external sponsors, negotiation/acceptance of grant and contract awards, and
other Sponsored programs-related matters. Sponsored programs shall assist
faculty and staff with:
(1)
Retrieval of funding source
information;
(2)
Preparation of proposal applications to include
budgeting;
(3)
Authorization and submission of proposals to
federal/state/local/private sponsors;
(4)
Negotiation/acceptance of grant/contract award agreements to
include review of terms/conditions;
(5)
Plans for
spending awarded funds;
(6)
Award modifications to include changes in scope of work
or key personnel, re-budgeting, and/or no-cost extension requests;
and
(7)
Grant/contract personnel appointments.
(8)
Additionally, in
cases of proposed or awarded projects, sponsored programs shall guide faculty
and staff in interpretation of university/federal/state/other sponsor policies
relative to cost principles; external sponsor-required university cost sharing;
effort certification; university use/maintenance/sharing of equipment;
intellectual property rights; use of human participants; animal care and use;
use of high hazard chemicals, radioactive materials, recombinant DNA,
bio-hazardous materials, select agents/toxins; matters related to export
controlled data; and classified research/sensitive but unclassified
research.
(B)
Scope. A "sponsored project" is defined as any
externally funded research or scholarly activity that has a defined scope of
work or set of objectives, which provides a basis for sponsor expectations.
This more specifically involves research, demonstration, professional
development, instruction, training, curriculum development, community and
public services, or other scholarly activity involving funds, materials, or
other forms of compensation, or exchanges of in-kind efforts under awards or
agreements.
(1)
A project is consider a "sponsored project" if any one of
the following conditions apply:
(a)
The project is awarded based on a proposal
request;
(b)
The university commits to a statement of work for a
specified project;
(c)
The project involves a set of objectives which provides
the basis for sponsor expectations;
(d)
The proposal
includes a detailed budget;
(e)
There is a
written agreement for a commitment of resources between a sponsor and the
university, there is a specified period of performance, requires deliverables
(such as reports, financial accounting, or intellectual property
ownership);
(f)
The award provides for the disposition of tangible or
intangible property that may result from the project (such as equipment,
records, formal activity reports, rights in data, software, copyrights,
invention or research-related materials);
(g)
The sponsor is
involved in making decision regarding project performance; or
(h)
The project
involves the use of human subjects, laboratory animals, radioactive or
hazardous materials, recombinant DNA, carcinogens, pathogens or proprietary
materials.
(C)
General
principles.
(1)
To generate proposals for external funding to the
university, Sponsored programs will disseminate information on funding
opportunities across all campuses.
(2)
Compliance.
Proposals must be consistent with the mission of the university and must be
suitable to the unit in which the project is to be conducted. A proposal is a
formal offer by the university to conduct a program under the direction of the
principal investigator/project director who does so utilizing personnel and
facilities of the university. Therefore, projects must comply both with
university policies and external sponsor regulations. Authority for proposal
submission resides in sponsored programs where the authorized organizational
representative (AOR) or his/her designee is the legal signatory on
submissions.
(3)
Acceptance and contracting authority. A grant or
contract award is an award to Kent state university and, as such, must be
accepted by the university. Authority for acceptance resides in sponsored
programs where the AOR or his/her designee serves as the legal signatory on
grant or contract agreement documents.
(4)
Principal
investigators/project director role eligibility. Faculty members and
professional staff who are full-time university employees may serve as
principal investigators/project directors. It is the responsibility of the
principal investigators/project directors to maintain academic and research
integrity in the conduct of his/her sponsored project. A project may be carried
out under the direction of one or more principal investigators/project
directors within a single department, school, institute, center, regional
campus or college or under the direction of such individuals from various
cooperating units. In extenuating circumstances, an individual who is not a
full-time employee may serve as principal investigator/project director; such
cases must be sanctioned by the chair of the department/institute or center
director, or regional campus dean from which the proposal is submitted. A
full-time employee must assume both reporting and fiscal responsibility for the
resulting award if granted.
(5)
Approval process.
Prior to the submission of the proposal to an external sponsor, a proposal must
be approved electronically through the Coeus grant proposal and management
system, or any subsequent system in place at the university as designated by
sponsored programs. Though completion of the routing and approval process, the
principal investigator/co-investigator/project director/co-director must accept
responsibility for the proposal's content while also certifying compliance with
the sponsoring agency and institutional requirements. Also prior to submission
to an external sponsor, the proposal must be approved by the appropriate
chair(s), director(s), regional campus dean(s), dean(s), or other university
officer(s), as relevant, indicating to sponsored programs that the proposed
project, its budget, and the level of effort committed by university personnel
have the necessary university endorsements.
(a)
In reviewing the proposed project, the chair/director, dean
or regional campus dean must ascertain that the proposed project is consistent
with the goals of the department, college, school, or regional campus, that the
faculty level of effort dedicated to the project is compatible with the unit's
needs, and that any cost-sharing commitment is both possible and suitable. The
college dean or regional campus dean shall review the proposed project to
ascertain to what degree the project commits the college to long-term support
of project personnel or program support beyond the award period.
(6)
Budget. Sponsored programs staff shall determine the cost of
a sponsored project in accord with principal investigator/project director
needs and external sponsor program guidelines. The proposed project's budget
shall include allowable direct costs, facilities and administrative costs, and,
as needed, the appropriate, sponsor required university cost share whose source
and amount has been approved by responsible chair, director, regional campus
dean, or vice president.
(7)
Cost sharing shall become part of a proposed project's
budget when required by the external sponsor and only when authorized by the
appropriate university official representing the unit providing the cost share.
Cost sharing on one project precludes its use on another project. Sponsored
programs shall ascertain that costs requested from an external sponsor as well
as university cost sharing meet the cost principles (OMB A-21) of allowability,
allocability, reasonableness, and consistency (with university financial
practices). The university assumes the position that voluntary (not required by
the external sponsor) cost sharing shall not ordinarily be offered, and that
the university's negotiated facilities and administrative rate, an essential
sponsored project cost, shall not be waived. When Kent state university project
costs include subrecipient costs, in order to incorporate such costs into the
Kent state university proposed budget, sponsored programs must receive adequate
documentation from the subrecipient prior to proposal
submission.
(8)
Research projects involving use of human subjects must
be reviewed by the university's institutional review board (IRB) prior to
proposal submission or within
30
thirty days after proposal submission if allowed by
external sponsor guidelines (see rule
3342-3-03.2 of this
Administrative Code). A project's human subjects must be protected in accord
with federal regulations. A project that does not comply may not be
conducted.
(9)
Live vertebrate animals. Research projects involving
use of live vertebrate animals must be reviewed by the university's
institutional animal care and use committee (IACUC, as provided for in rule
3342-3-03.3 of
this
the
Administrative Code). No project involving animals may begin without approval
by and adherence to recommendations by IACUC.
(10)
Hazardous
materials. Research projects involving use of high hazard chemicals,
recombinant DNA, bio-hazardous materials, radioactive materials, or select
agents/toxins must receive approval from the manager, research safety and
compliance in research and sponsored programs. No project may begin without
such approval.
(11)
Export controls. The conduct of research projects
involving export-controlled data must be approved by sponsored programs in
concert with university legal counsel, with the aim of maintaining university
exemption from export control restrictions based upon the university's position
that it is (under "National Security Decision Directive 189") a fundamental
research institution with publication rights which the university shall not
waive. In such cases where export controlled information is a consideration,
the university shall, as necessary, implement its master technology control
plan accompanied by the annex appropriate to the specific project in question.
Each project involving export-controlled information will comply with its
specific annex.
(12)
The university shall maintain its publication rights in
all sponsored projects. The university shall not accept awards or enter into
agreements for the support of research that permits another party the power to
prohibit publication of or dissemination in any form of results of the
sponsored research activities. The university shall permit short delays
(30
thirty to
60
sixty days)
of publication or dissemination of results in order for sponsor review, not
sponsor approval, in order for sponsors to remove inadvertently included,
sponsor-provided proprietary information or for sponsors to seek patent
applications; in such cases, these delay conditions will be specified in the
initial grant/contract award.
(13)
Classified
research. At times, a government agency or an industry has need to contract
with the university for a research project under conditions that do not permit
free inquiry and disclosure of results. Such research is "classified research."
Contracts for classified research may be considered on a case-by-case basis.
The general purpose and method of such research shall be disclosed to pertinent
faculty and administrators so that they can judge the appropriateness of the
research and its contribution to human knowledge and well being. The funding
agency shall not influence the selection or promotion of faculty members or the
formulation of university academic policy. The study's results and conclusion
shall be available for open discussion and/or publication after a reasonable
period of time. To ensure adherence to these policies, faculty members shall
submit any proposal responding to an external sponsor request involving
classified research to the vice president of research for review and
consideration. The vice president of research may consult with the university
research council. The principal investigator or the granting agency may appeal
the decision of the vice president to the provost. In order to facilitate the
conduct of federal classified grants or contracts, the university shall
continue to hold a "facility clearance." This involves providing the physical
means to protect security data, perhaps requiring personal security clearance
of certain university officers and other employees.
(14)
Gifts. A
solicitation for a gift (a donation that has no requirements attached and is
not work for hire) is submitted through the office of institutional advancement
and foundation. The office of institutional advancement and foundation is also
responsible for submission of other proposed projects in such cases where the
agencies/foundations require submission by that office. In these latter cases,
sponsored programs shall assist the office of institutional advancement and
foundation with accurate proposal budget development.
(15)
Approving
department. A proposal to an external sponsor is subject to approval of the
department in which the sponsored project will reside. The proposal may be
submitted only if the proposed project does not unduly disrupt the established
research and teaching programs of the university and department, that is, if
teaching obligations can be met or rearranged as needed; if appropriate space,
equipment, and facilities can be made available to the project; and, if the
university can provide for continuation of support for a project's new
positions if required
(D)
Implementation:
proposal preparation and submission.
(1)
Individual faculty/staff members prepare proposals in
accord with external sponsor guidelines.
(2)
Sponsored
programs staff shall review the proposal and provide project proposal support
including but not limited to the following services:
(a)
Sponsored
programs staff shall review the proposal for adherence to university policy and
sponsor regulations.
(b)
Sponsored programs staff shall assist with development
of the budget, ensuring its adequacy for the proposed work, allowability (meets
cost principles as delineated in OMB A-21 and external sponsor cost
requirements), and consistency with university financial procedures; and shall
ascertain that the university is not cost sharing unnecessarily or
unduly.
(c)
Sponsored programs staff shall review the level of
effort committed and the indicated current and pending support.
(d)
Sponsored
programs staff shall ensure that the principal investigator/project director
follows university-required procedures (involving as necessary the
institutional review board, the institutional animal care and use committee,
the manager, research safety and compliance, university legal counsel) when
human subjects, animals, export controlled data, high hazard chemicals,
recombinant DNA, bio hazardous materials, radioactive materials, select
agents/toxins, or new use of space (obtaining approval from the relevant
university official) are involved in the project's conduct.
(3)
Sub-recipient institution. When a sub-recipient institution
serves as a partner in the university's proposed project, sponsored programs
staff shall coordinate the proposal submission with the subrecipient. Sponsored
programs staff shall obtain, prior to submission of the proposal, the necessary
subrecipient documents. This documentation shall be in the form of a letter of
commitment to the project, an officially authorized budget for subrecipient
costs and cost sharing if applicable, the sub-recipient's statement of work
substantiating what that institution will do for its proposed costs, and
verification of the sub-recipient's facilities and administrative
rate.
(4)
AOR authorization. Every proposal must be authorized by
the AOR for submission and submitted by sponsored programs staff to the
external sponsor.
(5)
Endorsement. Prior to its submission to an external
sponsor, the proposal must be approved electronically through Coeus by the
appropriate chair/director and dean or regional campus dean. In reviewing the
proposed project, the chair/director, dean or regional campus dean and
executive dean for regional campuses must ascertain that the proposed project
is consistent with the goals of the department, college, school, or regional
campus, that the faculty level of effort dedicated to the project is compatible
with the unit's needs, and that any cost sharing commitment is both possible
and suitable. The college dean or regional campus dean shall review the
proposed project to ascertain to what degree the project commits the college to
long-term support of project personnel or program support beyond the award
period.
(6)
Conflict of interest. Prior to its submission to an
external sponsor, all potential conflicts of interest must be disclosed (see
rules 3342-3-07 and
3342-3-07.1 of the
this
Administrative
Code) by the project's key personnel (those who have a role if the design,
conduct, or reporting of the project! Each investigator must complete the
"investigator certification" in Coeus, which incorporates the financial
conflict of interest screening form questions, while key personnel must
complete the financial conflict of interest screening form.
(7)
Time for
submission. Sufficient time shall be allowed for sponsored programs to process
the proposed project. University principal investigators/project directors
submitting proposals must follow the established timelines to ensure
efficiency, expediency, and quality of the proposal process.
(a)
Sponsored
programs should be notified of intention to submit a proposal at least ten
10
working
days before the submission deadline.
(b)
A complete
proposal with the final budget must be entered into Coeus and routed for
internal approval no later than five working days prior to the due
date.
(c)
If narrative proposal documents will be revised after
submission for internal approval, all files must be finalized in Coeus no later
than two working days before the due date of the proposal to the external
agency or source.
(E)
Procedures:
Grant/contract acceptance, initiation, and administration
(1)
The grant or
contract award to Kent state university is issued as a document that must be
reviewed by sponsored programs staff, often in concert with university legal
counsel; prior to acceptance, unacceptable clauses are modified or struck from
the agreement. Acceptance is evidenced by the AOR's signature on the award
agreement document. The university does not make funds available to the
principal investigator/project director until he/she has met all compliance
requirements (e.g., financial conflict of interest, IRB,
IACUC).
(2)
When an award to the university includes subrecipient
collaboration, the university shall issue the subaward agreement that includes
the external sponsor's award terms and conditions. The subaward agreement will
require the subrecipient's certification of compliance with federal regulations
and/or other external sponsor requirements. The agreement is then executed
between Kent state university and the subrecipient. Ongoing monitoring of
subrecipient technical performance is documented by the principal
investigator/project director and of administrative requirements by sponsored
programs and grants accounting.
(3)
In the
administration of grant or contract awards, sponsored programs shall abide
by:
(a)
The
award instrument issued by the particular funding agency;
(b)
OMB circulars
A-21, A-133, A-I 10;
(c)
Other federal regulations; and
(d)
University
policies.
(4)
When an external sponsor selects a proposal for an
award, the sponsor commonly requests additional budgetary or technical
information. Such budgetary information may be provided only by sponsored
programs staff.
(5)
Any award negotiation that takes place between Kent
state university and an external sponsor must be conducted by sponsored
programs. If an external sponsor contacts a principal investigator/project
director directly, he/she shall advise sponsored programs. Prior to finalizing
negotiations, sponsored programs staff shall work with the principal
investigator/project director to ensure that his/her needs are met and that the
university is protected. Sponsored projects are subject to facilities and
administrative costs (F&A) at the university's current federally-approved
F&A cost rate agreement applicable to the type of project being conducted.
If the sponsor has a published policy, uniformly applied, prohibiting or
restricting the payment of F&A costs, the university may accept the reduced
F&A rate in accordance with the sponsors policy. This does not apply to
for-profit sponsors that are expected to provide full F&A
recovery.
(6)
The principal investigator/project director shall
operate within university policy and external sponsor requirements and shall be
responsible for day-to-day direction and financial and administrative
management of his/her awarded project. Sponsored programs staff shall guide the
principal investigator/project director in the interpretation of university
policy and external sponsor requirements. University policy and external
sponsor terms and conditions shall be followed for all sponsored program
activities including but not limited to travel, equipment acquisition,
employment and committed effort of personnel, participation of human
participants, and/or use of animals. The principal investigator/project
director shall fulfill the requirement for review and certification of
salaries, assuring that salaries charged to sponsored projects correspond to
effort expended on those projects.
(7)
Equipment as
defined by the university that is purchased with grant/contract funds shall be
subject to university equipment inventory control procedures regardless of
whether title vests in the university or the funding agency. The principal
investigator/project director shall be responsible for such equipment, shall
purchase the equipment in due time (well before an award end date), and shall
account for all items periodically as well as at the project's end. Retention
and disposal of equipment at project termination falls into three
categories:
(1)
(a)
equipment purchased by the
university with university funds (deemed to' be cost share) remains in the
department, school, or regional campus of the principal investigator/project
director and cannot be removed from the university by a resigning principal
investigator/project director;
(2)
(b)
special purpose equipment purchased by the university
with grant or contract funds with title vested in the university by a sponsor
remains in the principal investigator/project director's department, school, or
regional campus and may be transferred with the approval of the appropriate
chair/director/regional campus dean to a principal investigator/project
director's new institution upon his/her resignation, only if the
department/school/regional campus has no use for the equipment (final approval
for transfer rests with the provost or his/her designee: and
(3)
(c)
equipment purchased with grant/contract funds that
remains vested with the external sponsor shall be tagged appropriately to
identify the sponsor and grant/contract number and shall be disposed of in
accord with external sponsor instructions and as coordinated between the
controller's office and sponsored programs.
(8)
Kent state
university considers that cost sharing included in proposal budgets and
accepted by the sponsoring agency is an award condition and university
obligation. Cost sharing is subject to audit; the external sponsor will require
repayment of a portion of grant funds if the proposed cost sharing is not
obtained/documented and could terminate an active award. Cost sharing
obligations, including both mandatory and voluntary-committed investigator
effort, are appropriately recorded by project in the university's accounting
records and substantiated by documentation (e.g., effort certification, vendor
letters stating equipment value). Cost sharing is monitored for timeliness and
adequacy as well as for allowability, allocability, reasonableness, and
consistency with other university charging procedures. Cost sharing
expenditures like expenditures subsidized by the grant/contract award must
comply with federal cost principles and sponsor award terms and conditions.
Where cost sharing is a requirement of a university-issued subaward, the cost
sharing commitment that the university requires from the subrecipient is
included in the university-issued subaward document. The subrecipient's
compliance with the required cost sharing commitment is then monitored by both
the principal investigator/project director and grants accounting and
appropriately reported to the external sponsor.
(9)
Throughout an
externally funded project's course, the principal investigator/project director
shall inform his/her chair/director, or regional campus dean as well as
sponsored programs staff if there is or will be
(1)
(a) any
deviation from the project's sponsor-approved scope of work, budget, and/or
level of personnel effort; or
(2)
(b) any other change necessitating external sponsor
approval. Sponsored Programs staff should be informed about any such proposed
deviations prior to discussions that might occur between the principal
investigator/project director and the external sponsor. The principal
investigator/project director shall not communicate directly with the external
sponsor about such deviations without approval from sponsored
programs.
(10)
A separate university-restricted index with its own
number shall be established for each externally sponsored project. All
project-related expenditures shall be charged directly to this index. All
expenditures must occur during the period of the grant/contract award.
Principal investigators/project directors shall be responsible for reviewing
the project expenditures (as documented in the university system-generated
reports) on a monthly basis, correcting any errors, and staying within the
sponsored programs-approved budget.
(11)
Costs allocable
to a particular sponsored agreement may not be shifted to other sponsored
agreements in order to meet deficiencies caused by overruns or other fund
considerations, or to avoid restrictions imposed by law, by terms of the
sponsored agreement, or for other reasons of convenience. Costs allocable to
activities sponsored by industry, foreign governments or other sponsors may not
be shifted to federally sponsored agreements. If a cost transfer is made due to
discovery of an error, the transfer must be supported by documentation that
fully explains how the error occurred and a certification of the correctness of
the new charge. sponsored programs staff must approve any cost transfer that
exceeds ninety days from the original erroneous charge.
(12)
External
sponsors and Kent state university expect principal investigators/project
directors to manage the funded grant/contract project both within the
sponsor-approved budget and project period. Unanticipated developments can,
however, necessitate modification of the budget, scope of work, personnel
effort, project period, or, in some cases, all of these. Principal
investigators/project directors who need a modification must submit the request
to sponsored programs for approval. The university has established procedures
to implement the federal expanded authorities and documents actions taken under
such federal expanded authorities. Exercising this authority, the university's
AOR is able to approve certain budget and time frame modifications, to include
pre-award costs, expeditiously without contacting the funding agency. When
required, the university seeks external sponsor prior approval for
modifications and maintains records of the approvals granted.
(13)
As recipients of
external funds, principal investigators/project directors must exercise
appropriate responsibility in reporting performance on the funded project to
the sponsor. Technical progress (e.g., quarterly, annual) and final reports
shall be submitted by the principal investigator/project director to the
external sponsor as required and in timely fashion. The principal
investigator/project director shall provide a copy of any submitted report (to
include electronic reports) to sponsored programs. At the project period's end,
the project work ceases; after the termination date, no additional expenditures
may be charged to the grant/contract index. A period of thirty to ninety days
is usually allowed to pay previously committed financial obligations prior to
grant accounting's preparation of the final financial report based on
expenditures recorded in the grant index. Grants accounting shall certify the
accuracy of the final fiscal report to the external sponsor. Final technical
reports, invention disclosure reports, subrecipient reports (property, patent,
technical, and fiscal) if applicable, and other reports as required by the
external sponsor shall be submitted by sponsored programs to the external
sponsor (the principal investigator/project director may have submitted the
final technical report as required). The university shall not pay the
subrecipient's final invoice until the reports and deliverables required from
the subrecipient have been received and accepted. The principal
investigator/project director shall certify that the subrecipient has
adequately completed the technical aspects of the work. Upon acceptance of
these closeout reports, grants accounting shall close the
index.
(14)
Considered an integral part of a
department/center/institute, school, or regional campus program and resources
base, grant/contracts/other sponsored agreements must be monitored not only by
the principal investigator/project director but also by the chair, director,
and college dean or by the regional campus dean. Project over-expenditures and
audit disallowances are, ultimately the responsibility and burden of the home
department/center/institute, school, or regional campus.
(15)
Records of
sponsored project activities (financial and programmatic records, supporting
documents, statistical records, lab books, records for real property and
equipment) shall be retained for the active years plus five years.
Replaces: 3342-3- 04.1