[Comment: For dates and availability of non-regulatory
government publications, publications of recognized organizations and
associations, federal rules, and federal statutory provisions referenced in
this rule, see paragraph (JJ) of rule 3745-21-01 of the Administrative Code
entitled "referenced materials."]
(A)
Applicability.
(1) Except as otherwise
provided in paragraphs (A)(4) and (A)(5) of this rule, paragraph (C) of this
rule shall apply to any facility that has a batch process train associated with
any of the following SIC codes: 2821, 2833, 2834, 2861, 2865, 2869, or 2879,
and meets paragraph (A)(1)(a), (A)(1)(b), or (A)(1)(c) of this rule:
(a)
Applicability for
the Cincinnati area (meets both of the following):
(a)(i) The facility is
located in Butler, Clermont, Hamilton, or Warren county.
(b)(ii)
The facility has a combined total potential to emit for VOC emissions equal to
or greater than one hundred tons of VOC per calendar year on or after May 27,
2005 from all of the following:
(i)(a) Process vents in
batch operations.
(ii)(b) All non-CTG
sources.
(iii)(c) Unregulated
emissions from CTG sources except sources regulated under 40 CFR part
60,
subparts BBB, III, NNN, and RRR and sources regulated under 40 CFR part
63,
subpart T.
(b)
Applicability for
the Cleveland-Akron-Lorain area as of August 25, 2008 (meets both of the
following):
(c)(i) The facility is
located in Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, or
Summit county.
(d)(ii) The facility has a
combined total potential to emit for VOC emissions equal to or greater than one
hundred tons of VOC per calendar year on or after August 25, 2008 from all of
the following:
(i)(a) Process vents in
batch operations.
(ii)(b) All non-CTG
sources.
(iii)(c) Unregulated
emissions from CTG sources except sources regulated under 40 CFR part
60,
subparts BBB, III, NNN, and RRR and sources regulated under 40 CFR part
63,
subpart T.
(c)
Applicability for
the Cleveland area as of the effective date of this rule (meets both of the
following):
(i)
The facility is located in Cuyahoga, Geauga, Lake, Lorain,
Medina, Portage, or Summit county.
(ii)
The facility has
a combined total potential to emit for VOC emissions equal to or greater than
fifty tons of VOC per calendar year, but less than one hundred tops of VOC per
calendar year, on or after the effective date of this rule from all of the
following:
(a)
Process vents in batch operations
(b)
All non-CTG
sources.
(c)
Unregulated emissions from CTG sources except sources
regulated under 40 CFR part 60, subparts BBB, III, NNN, and RRR and sources
regulated under 40 CFR part 63, subpart T.
(2) For the purposes of
paragraph (A)(1) of this rule, a source shall be considered regulated by a
paragraph, rule or subpart if the source is subject to the limits of that
paragraph, rule, or subpart. A source is not considered regulated by a
paragraph, rule, or subpart if the source is not subject to the limits of that
paragraph, rule, or subpart. For example, if the source is covered by an
exemption in the paragraph, rule, or subpart, or the applicability criteria of
the paragraph or subpart are not met, then the source is not subject to that
paragraph, rule, or subpart. A source is also not considered regulated if there
is no rule contained in this chapter regulating the source category.
(3) Once a facility has met the applicability
requirements of paragraphs
paragraph (A)(1)(a) and
(A)(1)(b) of this rule on or after May 27, 2005, or the applicability
requirements of paragraphs (A)(1)(c) and
(A)(1)(d)
paragraph (A)(1)(b) of this
rule on or after August 25, 2008, or the applicability
requirements of paragraph (A)(1)(c) of this rule on or after the effective date
of the rule, the facility is always subject to paragraph (C) of this
rule, except as otherwise provided in paragraphs (A)(4),
and (A)(5), and (A)(6) of this rule.
(4) In the event a facility meets the
applicability requirements under paragraphs
paragraph
(A)(1)(a) and (A)(1)(b) of this rule, but
reduces the facility's potential to emit for volatile organic compounds by
means of federally enforceable operational restrictions (e.g., production,
hours of operation, or capacity utilization) to less than one hundred tons per
year by no later than May 27, 2006, and documents that the actual VOC emissions
from the above combined sources have never exceeded one hundred tons per year
after the baseline year (1990) of the state implementation plan for ozone, the
facility is not subject to paragraph (C) of this rule.
(5) In the event a facility meets the
applicability requirements under paragraphs
(A)(1)(c) and (A)(1)(d)
paragraph
(A)(1)(b) of this rule, but reduces the facility's potential to emit for
VOCs by means of federally enforceable operational restriction (e.g.,
production, hours of operation, or capacity utilization) to less than one
hundred tons per year by no later than August 25, 2009, and documents that the
actual VOC emissions from the above combined sources have never exceeded one
hundred tons per year after the baseline year (2002) of the state
implementation plan for ozone, the facility is not subject to paragraph (C) of
this rule.
(6)
In the event a facility meets the applicability
requirements under paragraph (A)(1)(c) of this rule, but reduces the facility's
potential to emit for VOCs by means of federally enforceable operational
restriction (e.g., production, hours of operation, or capacity utilization) to
less than fifty tons per year by no later than one year after the effective
date of this rule, and documents that the actual VOC emissions from the above
combined sources have never exceeded fifty tons per year after the baseline
year (2014) of the state implementation plan for ozone, the facility is not
subject to paragraph (C) of this rule.
(B) Definitions.
The definitions applicable to this rule are contained in
paragraph (W) of rule 3745-21-01 of the Administrative Code.
(C) Applicability for batch process trains
and unit operations (batch operations).
(1)
Except as otherwise provided in paragraphs (C)(2) and (C)(3) of this rule, the
owner or operator of a batch process train at a facility that meets the
applicability criteria of paragraph (A)(1) of this rule is subject to
paragraphs (D) to (K) of this rule.
(2) Paragraphs (D) to (J) of this rule shall
not apply to the following:
(a) Any emissions
unit included within any early reduction program, as specified in 40 CFR part
63, and published in 57 Federal Register 61970 (December 29, 1992), evidenced
by a timely enforceable commitment approved by USEPA.
(b) Any unit operation at a synthesized
pharmaceutical manufacturing facility that is subject to paragraph (W)(1) of
rule 3745-21-09 of the Administrative Code.
(3) The following unit operations within a
batch process train and batch process trains are exempt from paragraph (D) of
this rule, but are still subject to paragraphs (H), (I) and (K) of this rule
pertaining to recordkeeping, reporting, applicability notification, and permit
application:
(a) Any unit operation with
uncontrolled total annual mass emissions of less than or equal to five hundred
pounds per year of VOC.
Such unit operations are also excluded from the calculation of
the total annual mass emissions for a batch process train. If the uncontrolled
total annual mass emissions from such exempt unit operation exceed five hundred
pounds per year of VOC in any subsequent year, the owner or operator shall
calculate applicability in accordance with paragraph (C)(4) of this rule for
both the individual unit operation and the batch process train containing the
unit operation.
(b) Any
batch process train containing process vents that have, in the aggregate,
uncontrolled total annual mass emissions, as determined in accordance with
paragraph (E)(1) of this rule, of less than thirty thousand pounds per year of
VOC for all products manufactured in such batch process train.
(4) The applicability equations in
paragraph (C)(5) of this rule, which require the calculation of uncontrolled
total annual mass emissions and flow rate value, shall be used to determine
whether a unit operation or a batch process train is subject to the control
requirements set forth in paragraph (D) of this rule. The applicability
equation shall be applied to the following:
(a) Any unit operation with uncontrolled
total annual mass emissions that exceed five hundred pounds per year and with a
VOC concentration greater than five hundred ppmv. In this individual
determination, no applicability analysis shall be performed for any unit
operation with a VOC concentration of less than or equal to five hundred
ppmv.
(b) Any batch process train
containing process vents which, in the aggregate, have uncontrolled total
annual mass emissions of thirty thousand pounds per year or more of VOC from
all products manufactured in the batch process train. Any unit operation with
uncontrolled total annual mass emissions exceeding five hundred pounds per
year, regardless of VOC concentration, shall be included in the aggregate
applicability analysis.
(5) Applicability equations.
(a) The applicability equations under this
paragraph are specific to volatility.
(b) For purposes of this paragraph, the
following abbreviations are employed:
(i) FR =
calculated applicability flow rate, scfm.
(ii) UTAME = uncontrolled total annual mass
emissions of VOC, expressed as pounds per year.
(iii) WAV = weighted average
volatility.
(iv)
MVOCi = mass of VOC component i.
(v) MWVOCi = molecular
weight of VOC component i.
(vi)
VPi = vapor pressure of VOC component i.
(vii) i = subscript denoting a specific VOC
component.
(viii) n = total number
of VOC components.
(c)
Weighted average volatility shall be calculated as follows:
Click to
view image
(d)
For purposes of determining applicability, calculated applicability flow rate
values shall be determined as follows:
(i)
Process vents with a WAV that is less than or equal to seventy-five mmHg at
twenty degrees Celsius (sixty-eight degrees Fahrenheit), shall use the
following equation:
FR = [0.07 (UTAME)] - 1,821
(ii) Process vents with a WAV that is greater
than seventy-five mmHg, but less than or equal to one hundred fifty mmHg at
twenty degrees Celsius (sixty-eight degrees Fahrenheit), shall use the
following equation:
FR = [0.031 (UTAME)] - 494
(iii) Process vents a WAV that is greater
than one hundred fifty mmHg at twenty degrees Celsius (sixty-eight degrees
Fahrenheit), shall use the following equation:
FR = [0.013 (UTAME)] - 301
(D) Control of VOC
emissions from process vents.
The controls set forth in this paragraph shall apply to process
vents of batch process trains and unit operations within batch process trains
(batch operations).
(1) The owner or
operator of a unit operation with an average flow rate, as determined in
accordance with paragraph (E)(2) of this rule, below the flow rate value
calculated by the applicability equations contained in paragraph (C)(5) of this
rule, shall reduce uncontrolled VOC emissions from such unit operation by an
overall efficiency, on average, of at least ninety per cent, or to twenty ppmv,
per batch cycle.
(2) The owner or
operator of a batch process train with an average flow rate, as determined in
accordance with paragraph (E)(2)(b) of this rule, below the flow rate value
calculated by the applicability equations contained in paragraph (C)(5) of this
rule, shall reduce uncontrolled VOC emissions from such batch process train by
an overall efficiency, on average, of at least ninety per cent, or to twenty
ppmv, per batch cycle.
(3) If a
boiler or process heater is used to comply with paragraph (D)(1) or (D)(2) of
this rule, the vent stream shall be introduced into the flame zone of the
boiler or process heater.
(4) If a
flare is used to comply with paragraph (D)(1) or (D)(2) of this rule, the flare
shall comply with paragraph (DD)(10)(d) of rule 3745-21-09 of the
Administrative Code. If a process, not subject to this rule, vents an emergency
relief discharge into a common flare header of this flare, paragraph
(DD)(10)(d) of rule 3745-21-09 of the Administrative Code shall not apply
during such emergency relief discharge.
(5)
Paragraphs (D)(1)
to (D)(4) of this rule are not applicable to any batch process train where the
director has established and USEPA has approved source-specific
RACT.
(E)
Determination of uncontrolled total annual mass emissions and actual weighted
average flow rate values for a batch process train or unit operation.
(1) Uncontrolled total annual mass emissions
shall be determined by the following methods:
(a) Direct process vent emissions
measurements taken prior to any release to the atmosphere, following any
recovery device, prior to mixing with vents from other process trains or
unrelated operations, and prior to any control device, provided such
measurements conform with the requirements of measuring the mass flow rate of
VOC incoming to the control device as set forth in paragraphs (F)(6)(b),
(F)(6)(c)(i)(a) and (F)(6)(c)(i)(b) of this rule.
(b) Engineering estimates of the uncontrolled
VOC emissions from a process vent or process vents, in the aggregate, within a
batch process train, using either the potential or permitted number of batch
cycles per year or total production as represented in the permit for the batch
process train as follows:
(i) Engineering
estimates of the uncontrolled VOC emissions shall be based upon accepted
chemical engineering principles, measurable process parameters, or physical or
chemical laws and their properties. Examples of methods include, but are not
limited to, the following:
(a) Use of material
balances based on process stoichiometry to estimate maximum VOC
concentrations.
(b) Estimation of
maximum flow rate based on physical equipment design such as pump or blower
capacities.
(c) Estimation of VOC
concentrations based on saturation conditions.
(ii) All data, assumptions and procedures
used in any engineering estimate shall be documented.
(2) Average flow rate shall be
determined by any of the following methods:
(a) Direct process vent flow rate
measurements taken prior to any release to the atmosphere, following any
recovery device, prior to mixing with vents from other process trains or
unrelated operations, and prior to any control device, provided such
measurements conform with the requirements of measuring incoming volumetric
flow rate set forth in paragraph (F)(6)(b) of this rule.
(b) Average flow rate for a unit operation
having multiple emission events or batch process trains shall be the weighted
average flow rate, calculated as follows:
Click to
view image
where:
WAF = actual weighted average flow rate for a unit operation or
batch process train.
AFRi = average flow rate of emission
event i.
ADEi = annual duration of emission event
i.
i = subscript denoting a specific emission event.
n = number of emission events.
(c) Engineering estimates calculated in
accordance with paragraph (E)(1)(b) of this rule.
(3) For purposes of determining the average
flow rate for steam vacuuming systems, the steam flow shall be included in the
average flow rate calculation.
(F) Compliance testing for a batch process
train or unit operation.
(1) Upon the
director's request, the owner or operator of a batch process train or unit
operation within a batch process train shall conduct testing to demonstrate
compliance with paragraph (D) this rule. The owner or operator shall, at the
owner or operator's own expense, conduct such tests in accordance with the
applicable test methods and procedures specified in paragraphs (F)(4) to (F)(6)
of this rule.
(2) Notwithstanding
paragraph (F)(1) of this rule, flares and process boilers used to comply with
paragraph (D) of this rule shall be exempt from compliance testing
requirements.
(3) When a flare is
used to comply with paragraph (D) of this rule, the flare shall comply with
paragraph (DD)(10)(d) of rule 3745-21-09 of the Administrative Code.
(4) The owner or operator of a batch process
train or unit operation within a batch process train that is exempt from
paragraph (D) of this rule due to an average flow rate that is equal to or
above the calculated applicability flow rate or due to a VOC concentration of
less than or equal to five hundred ppmv (unit operation) shall demonstrate,
upon the director's request, the absence of oversized gas moving equipment in
any manifold. Gas moving equipment shall be considered oversized if the
equipment exceeds the maximum requirements of the exhaust flow rate by more
than thirty per cent.
(5) For the
purpose of demonstrating compliance with paragraph (D) of this rule, the batch
process train or unit operation shall be run at representative operating
conditions and flow rates during any compliance test.
(6) The following methods in 40 CFR part
60,
appendix A shall be used to demonstrate compliance with the reduction
efficiency requirement set forth in paragraph (D) of this rule:
(a) USEPA method 1 or 1A, as appropriate, for
selection of the sampling sites if the flow measuring device is not a
rotameter. The control device inlet sampling site for determination of vent
stream VOC composition reduction efficiency shall be prior to the control
device and after the control device.
(b) USEPA method 2, 2A, 2B, 2C, or 2D, as
appropriate, for determination of gas stream volumetric flow rate flow
measurements, which shall be taken continuously. No traverse is necessary when
the flow measuring device is an ultrasonic probe.
(c) USEPA method 25A or USEPA method 18, if
applicable, to determine the concentration of VOC in the control device inlet
and outlet.
(i) The sampling time for each run
shall be as follows:
(a) For batch cycles less
than eight hours in length, readings shall be taken continuously over the
entire length of the batch cycle with a maximum of fifteen-minute intervals
between measurements if using USEPA method 25A. If using USEPA method 18,
readings shall be taken continuously with a maximum of fifteen-minute intervals
between measurements throughout the batch cycle unless it becomes necessary to
change the impinger train, in which case a thirty-minute interval shall not be
exceeded.
(b) For batch cycles of
eight hours and greater in length, the owner of operator may either test in
accordance with the test procedures defined in paragraph (F)(6)(c)(i)(a) of
this rule or the owner or operator may elect to perform tests, pursuant to
either USEPA method 25A or USEPA method 18, only during those portions of each
emission event which define the emission profile of each emission event
occurring within the batch cycle. For each emission event of less than four
hours in duration, the owner or operator shall test continuously over the
entire emission event as set forth in paragraph (F)(6)(c)(i)(a) of this rule.
For each emission event of greater than four hours in duration, the owner or
operator shall elect either to perform a minimum of three one hour test runs
during the emission event or shall test continuously over the entire emission
event within each unit operation in the batch process train. To demonstrate
that the portion of the emission event to be tested defines the emission
profile for the emission event, the owner or operator electing to rely on this
option shall develop an emission profile for the entire emission event. Such
emission profile shall be based upon either process knowledge or test data
collected. Examples of information that could constitute process knowledge
include, but are not limited to, calculations based on material balances and
process stoichiometry. Previous test results may be used provided such results
are still relevant to the current process vent stream conditions.
(ii) The mass emission rate from
the process vent or inlet to the control device shall be determined by
combining concentration and flow rate measurements taken simultaneously at
sampling sites selected in accordance with paragraph (F)(6)(a) of this rule
throughout the batch cycle.
(iii)
The mass emission rate from the control device outlet shall be obtained by
combining concentration and flow rate measurements taken simultaneously at
sampling sites selected in accordance with paragraph (F)(6)(a) of this rule
throughout the batch cycle.
(iv)
The efficiency of the control device shall be determined by integrating the
mass emission rates obtained in paragraphs (F)(6)(c)(ii) and (F)(6)(c)(iii) of
this rule, over the time of the batch cycle and dividing the difference in
inlet and outlet mass flow totals by the inlet mass flow total.
(7) The owner or
operator of a batch process train or unit operation may propose an alternative
test method or procedures to demonstrate compliance with paragraph (D) of this
rule. Such method or procedures shall be approved by the director and USEPA in
writing and shall be included as federally enforceable permit
conditions.
(8) In the absence of a
request by the director to conduct compliance testing in accordance with this
rule, the owner or operator may demonstrate compliance by the use of
engineering estimates or process stoichiometry.
(9) During the compliance test conducted to
demonstrate compliance with the control requirements of paragraph (D) of this
rule, the owner or operator shall establish the operating limits (operating
parameter values) for the monitoring devices required under paragraph (G) of
this rule.
(G)
Monitoring of control devices.
(1) Every owner
or operator using an incinerator to comply with paragraph (D) of this rule
shall install, calibrate, maintain and operate, according to manufacturer's
specifications, temperature monitoring devices with an accuracy of plus or
minus one per cent of the temperature being measured expressed in degrees
Celsius or plus or minus
1.8 per cent of the temperature
being measured expressed in degrees Fahrenheit, each equipped with a continuous
recorder as follows:
(a) Where a catalytic
incinerator is used, one of the following:
(i)
Temperature monitoring devices shall be installed in the gas stream immediately
before (upstream) and after (downstream) the catalyst bed.
(ii) If an owner or operator elects to
implement an inspection and maintenance plan for the catalytic incinerator that
meets paragraph (G)(8) of this rule, the temperature monitoring device shall be
located upstream of the catalyst bed only.
(b) Where an incinerator other than a
catalytic incinerator is used, a temperature monitoring device shall be
installed in the combustion chamber.
(2) The owner or operator using a flare to
comply with paragraph (D) of this rule shall install, calibrate, maintain and
operate, according to manufacturer's specifications, a heat sensing device,
such as an ultra-violet beam sensor or thermocouple, at the pilot light to
indicate continuous presence of a flame.
(3) Every owner or operator using a scrubber
to comply with paragraph (D) of this rule shall install, calibrate, maintain,
and operate, according to manufacturer's specifications, either of the
following:
(a) A temperature monitoring device
for scrubbant liquid having an accuracy of plus or minus one per cent of the
temperature being monitored expressed in degrees Celsius or plus or minus
1.8 per cent of the temperature
being measured expressed in degrees Fahrenheit and a specific gravity device
for scrubbant liquid, each equipped with a continuous recorder.
(b) A VOC monitoring device used to indicate
the concentration of VOC exiting the control device based on a detection
principle such as infrared photoionization, or thermal conductivity, equipped
with a continuous recorder.
(4) Every owner or operator using a condenser
to comply with paragraph (D) of this rule shall install, calibrate, maintain,
and operate, according to manufacturer's specifications, either of the
following:
(a) A condenser exit temperature
monitoring device equipped with a continuous recorder and having an accuracy of
plus or minus one per cent of the temperature being monitored expressed in
degrees Celsius or plus or minus
1.8 per cent of the temperature
being measured expressed in degrees Fahrenheit, equipped with a continuous
recorder.
(b) A VOC monitoring
device used to indicate the concentration of VOC such as infrared,
photoionization, or thermal conductivity, each equipped with a continuous
recorder.
(5) Every
owner or operator using a carbon adsorber to comply with paragraph (D) of this
rule shall install, calibrate, maintain, and operate, according to the
manufacturer's specifications, either of the following:
(a) An integrating regeneration steam flow
monitoring device having an accuracy of plus or minus ten per cent, and a
carbon bed temperature monitoring device having an accuracy of plus or minus
one per cent of the temperature being monitored expressed in degrees Celsius or
plus or minus 1.8 per cent of the temperature
being measured expressed in degrees Fahrenheit, both equipped with a continuous
recorder.
(b) A VOC monitoring
device used to indicate the concentration level of VOC exiting such device
based on a detection principle such as infrared, photoionization, or thermal
conductivity, equipped with a continuous recorder.
(6) Every owner or operator using a boiler or
process heater with a design heat input capacity less than one hundred fifty
million Btu per hour that is to comply with paragraph (D) of this rule shall
install, calibrate, maintain, and operate, according to the manufacturer's
specifications, a temperature monitoring device in the firebox with an accuracy
of plus or minus one per cent of the temperature being measured expressed in
degrees Celsius or plus or minus
1.8 per cent of the temperature
being measured expressed in degrees Fahrenheit, equipped with a continuous
recorder. Any boiler or process heater in which all process vent streams are
introduced with primary fuel is exempt from this requirement.
(7) Every owner or operator of a process vent
shall be permitted to monitor by an alternative method or may monitor
parameters other than those listed in paragraphs (G)(1) to (G)(6) of this rule,
if approved by the director and USEPA in writing. Such alternative method or
parameters shall be contained in a permit pertaining to the process vent as
federally enforceable permit conditions.
(8) In accordance with paragraph
(G)(1)(a)(ii) of this rule, for an owner or operator that elects to monitor the
upstream temperature only of the catalytic incinerator, an inspection and
maintenance plan shall be developed, maintained on-site, and made readily
available upon the request of the appropriate Ohio EPA district office or local
air agency. At a minimum, the plan shall include the following:
(a) Annual sampling and analysis of the
catalyst activity (i.e., conversion efficiency) following the manufacturer's or
catalyst supplier's recommended procedures.
(b) Monthly inspection of the oxidizer system
including the burner assembly and fuel supply lines for problems.
(c) Annual internal and monthly external
visual inspection of the catalyst bed to check for channeling, abrasion, and
settling. If problems are found, corrective action consistent with the
manufacturer's recommendations shall be implemented and a new performance test
to determine destruction efficiency in accordance with paragraph (C) of rule
3745-21-10 of the Administrative Code shall be conducted.
(H) Recordkeeping for a
batch process train or unit operation.
(1)
Every owner or operator of a unit operation or batch process train that is
exempt from the control per paragraph (C)(3)(a) or (C)(3)(b) of this rule shall
keep records of the uncontrolled total annual mass emissions for such unit
operation or batch process train, as applicable, and documentation verifying
these values or measurements. The documentation shall include the engineering
calculations, any measurements made in accordance with paragraph (F) of this
rule, and the potential or permitted number of batch cycles per year, or, in
the alternative, total production as represented in the permit pertaining to
the unit operation or batch process train.
(2) Every owner or operator of a unit
operation or batch process train that is exempt from control per paragraph
(C)(4) of this rule shall keep the following records:
(a) The uncontrolled total annual mass
emissions and documentation verifying these values or measurements.
The documentation shall include any engineering calculations,
any measurements made in accordance with paragraph (F) of this rule, and the
potential or permitted number of batch cycles per year, or, in the alternative,
total production as represented in the permit pertaining to the unit operation
or batch process train.
(b)
The average flow rate in scfm and documentation verifying this value.
(c) The calculated weighted average
volatility and documentation verifying this value.
(d) The calculated applicability flow rate
value from paragraph (C)(5)(d) of this rule.
(3) Every owner or operator of a batch
process train or unit operation subject to paragraph (D) of this rule shall
keep records of the following parameters required to be monitored under
paragraph (G) of this rule:
(a) If using a
thermal or catalytic incinerator to comply with paragraph (D) of this rule, one
of the following:
(i) For a thermal
incinerator, records indicating the average combustion chamber temperature of
the incinerator measured continuously and averaged over the same time period as
the compliance test that demonstrated compliance.
(ii) For a catalytic incinerator where the
owner or operator elects to comply with paragraph (G)(1)(a)(i) of this rule,
records indicating the average temperature upstream and downstream of the
catalyst bed measured continuously and averaged over the same time period as
the compliance test that demonstrated compliance.
(iii) For a catalytic incinerator where the
owner or operator elects to comply with paragraphs (G)(1)(a)(ii) and (G)(8) of
this rule, the following records:
(a) Records
indicating the average temperature upstream of the catalyst bed measured
continuously and averaged over the same time period as the compliance test that
demonstrated compliance.
(b)
Records, and a description of the results of each inspection and catalyst
activity analysis resulting from the inspection and maintenance plan for the
catalytic incinerator as specified in paragraph (G)(8) of this rule.
(b) If using a flare
(i.e., steam-assisted, air-assisted or nonassisted) to comply with paragraph
(D) of this rule, continuous records of the flare pilot flame monitoring and
records of all periods of operations during which the pilot flame is
absent.
(c) If using any of the
following as a control device, the following records:
(i) Where a scrubber is used, the exit
specific gravity (or alternative parameter which is a measure of the degree of
absorbing liquid saturation, if approved by the director) and the average exit
temperature of the absorbing liquid, measured continuously and averaged over
the same time period as the compliance test that demonstrated compliance (both
measured while the vent stream is routed normally).
(ii) Where a condenser is used, the average
exit (product side) temperature measured continuously and averaged over the
same time period as the compliance test that demonstrated compliance while the
vent stream is routed normally.
(iii) Where a carbon adsorber is used, the
total steam mass flow measured continuously and averaged over the same time
period as the compliance test that demonstrated compliance (full carbon bed
cycle), temperature of the carbon bed after regeneration (and within fifteen
minutes after completion of any cooling cycle), and duration of the carbon bed
steaming cycle (all measured while the vent stream is routed
normally).
(iv) As an alternative
to paragraph (H)(3)(c)(i), (H)(3)(c)(ii), or (H)(3)(c)(iii) of this rule, at a
minimum, records indicating the concentration level or reading indicated by the
VOC monitoring device at the outlet of the scrubber, condenser, or carbon
adsorber, measured continuously and averaged over the same time period as the
compliance test that demonstrated compliance (while the vent stream is routed
normally).
(4)
Every owner or operator of a unit operation claiming a vent stream
concentration exemption level, as set forth in paragraph (C)(4)(a) of this
rule, shall maintain records to indicate the vent stream concentration is less
than or equal to five hundred ppmv, and shall notify the director in writing if
the vent stream concentration at any time equals or exceeds five hundred ppmv,
within sixty days after such event. Such notification shall include a copy of
all records of such event.
(5) An
owner or operator of a batch process train or unit operation subject to
paragraph (D) of this rule may maintain alternative records other than those
listed in paragraph (C) of this rule. Any alternative recordkeeping shall be
approved by the director and USEPA in writing and shall be contained in the
permit pertaining to the batch process train or unit operation as federally
enforceable permit conditions.
(6)
The owner or operator of a unit operation or batch process train that is exempt
from paragraph (D) of this rule shall notify the director in writing if the
uncontrolled total annual mass emissions from such unit operation or batch
process train exceed the threshold in paragraph (C)(3)(a) or (C)(3)(b) of this
rule, respectively, within sixty days after the event occurs. Such notification
shall include a copy of all records of such event.
(7) Every owner or operator of a batch
process train or unit operation required to keep records under this rule shall
maintain such records at the facility for a minimum period of five years and
shall make all such records available to the director upon request.
(I) Reporting.
(1) (General) This paragraph describes the
contents of reports and identifies the reporting dates for the following
reports:
(a) Initial compliance status
report.
(b) Semiannual compliance
status reports.
(2)
Initial compliance status report.
Each owner or operator of a batch process train or unit
operation subject to this rule shall submit an initial compliance status report
within sixty calendar days after the compliance dates specified in paragraph
(I) of this rule as follows:
(a) The
initial compliance status report shall include the results of exemption,
process vent determinations, compliance tests, values of monitored parameters
established during compliance tests, and any other information used to
demonstrate compliance and recorded pursuant to paragraph (H) of this
rule.
(b) For compliance tests and
process vent determinations based on measurements, the initial compliance
status report shall include one complete test report for each test method used
for a particular kind of process vent. For additional tests and measurements
performed for the same kind of process vent using the same test method, the
test results or measurement results shall be submitted, but a complete test
report is not required.
(c) A
complete test report shall include a brief process description, sampling site
description, description of sampling and analysis procedures and any
modifications to standard procedures, quality assurance procedures, record of
operating conditions during the test, record of preparation of standards,
record of calibrations, raw data sheets for field sampling, raw data sheets for
field and laboratory analyses, documentation of calculations, and any other
information required by the test method.
(d) For each monitored parameter for which a
range is required to be established under paragraph (F)(9) of this rule, the
compliance status report shall include the following information:
(i) The specific range of the monitored
parameter for each control device.
(ii) The rationale for the specific range for
each parameter for each control device, including any data and calculations
used to develop the range and a description of why the range indicates proper
operation of the control device or final recovery device.
(3) Semiannual compliance status
reports.
The owner or operator of a batch process train or unit
operation subject to this rule shall submit semiannual compliance status
reports no later than sixty calendar days after the end of each six-month
period to the appropriate Ohio EPA district office or local air agency. The
first report shall be submitted no later than eight months after the date the
initial compliance status report is due and shall cover the six-month period
beginning on the date the initial compliance status report is due. The
semiannual compliance status reports shall contain the following
information:
(a) Semiannual reports on
parameter monitoring for controlled process vents.
For a process vent equipped with a control device to meet
paragraph (D) of this rule, the semiannual compliance status reports shall
include the following recorded information:
(i) Reports of monitored parameters for all
operating days when the average values recorded under paragraph (H)(3) of this
rule were outside the ranges established in the initial compliance status
report or permit issued by the director.
(ii) Reports of the times and durations of
all periods recorded under paragraph (J)(3) of this rule when the monitoring
device is not working or monitoring data is not collected during process
operation generating the process vent stream or during operation of the control
or recovery device.
(iii) Reports
of the times and durations of all periods recorded under paragraph (H)(3)(b) of
this rule in which the pilot flame is absent.
(iv) Reports on monitoring devices and
parameters approved by the director pursuant to paragraph (H)(5) of this
rule.
(b) Semiannual
reports on subsequent compliance tests for controlled process vents and
subsequent process vent determination tests.
If any subsequent compliance tests or subsequent process vent
determination tests are conducted during the semiannual reporting period after
the initial compliance status report has been submitted, the semiannual
compliance status report shall include the data recorded pursuant to paragraphs
(H) of this rule.
(J) Compliance dates.
(1) Except where otherwise specified within
this rule, any batch process train that is subject to this rule shall comply
with this rule by no later than the following dates:
(a) For any batch process train
located in Butler, Clermont, Hamilton, or Warren
county
subject to this rule pursuant to
paragraph (A)(1)(a) of this rule for which installation commenced before
May 27, 2005, the compliance date of the batch process train is May 27, 2006 or
the date the facility becomes subject to this rule, whichever is
later.
(b) For any batch process
train located in Butler, Clermont, Hamilton, or
Warren county
subject to this rule pursuant to
paragraph (A)(1)(a) of this rule for which installation commenced on or
after May 27, 2005, the compliance date of the batch process train is the date
of initial startup of the batch process train.
(c) For any batch process train
located in Ashtabula, Cuyahoga, Geauga, Lake,
Lorain, Medina, Portage, or Summit county
subject to this rule pursuant to paragraph (A)(1)(b) of this
rule for which installation commenced before August 25, 2008, the
compliance date of the batch process train is August 25, 2009 or the date the
facility becomes subject to this rule, whichever is later.
(d) For any batch process train
located in Ashtabula, Cuyahoga, Geauga, Lake,
Lorain, Medina, Portage, or Summit county
subject to this rule pursuant to paragraph (A)(1)(b) of this
rule for which installation commenced on or after August 25, 2008, the
compliance date of the batch process train is the date of initial startup of
the batch process train.
(e)
For any batch process train subject to this rule
pursuant to paragraph (A)(1)(c) of this rule for which installation commenced
before the effective date of this rule, the compliance date of the batch
process train is one year after the effective date of this rule or the date the
facility becomes subject to this rule, whichever is later.
(f)
For any batch
process train subject to this rule pursuant to paragraph (A)(1)(c) of this rule
for which installation commenced on or after the effective date of this rule,
the compliance date of the batch process train is the date of initial startup
of the batch process train.
(2) In the event a facility reduces the
facility's potential to emit pursuant to paragraph (A)(4),
or (A)(5), or (A)(6) of this rule, the date on which the
facility subsequently meets paragraph (A)(1) of this rule is the date the
facility becomes subject to this rule.
(3) In the event a batch process train or
unit operation is exempted under paragraph (C)(3) of this rule or is not
required to reduce uncontrolled VOC emissions pursuant to paragraph (D)(1) or
(D)(2) and is subsequently equipped with a control device to meet the VOC
reduction requirements of paragraph (D)(1) or (D)(2) of this rule, the
compliance date of the batch process train or unit operation is the date of
first startup of the installed control device. Until the date of first startup
of the installed control device, the batch process train or unit operation
shall continue to meet either the exemption level or the criteria pertaining to
applicability equations.
(4) For
any control device that is used to comply with paragraph (D) of this rule, the
owner or operator shall demonstrate compliance by testing the control device in
accordance with paragraph (F) of this rule within ninety days after the
compliance date.
(5) Additional
testing of the control device or testing of the process vents of a batch
process train or unit operation in accordance with paragraph (F) of this rule
may be required by the director to ensure continued compliance with paragraph
(D) of this rule.
(K)
Applicability notification and permit application.
(1) The owner or operator of a facility that
is subject to this rule, is located in Butler,
Clermont, Hamilton, or Warren county
pursuant
to paragraph (A)(1)(a) of this rule, and that has an initial startup of a
batch process train before May 27, 2005 shall notify the appropriate Ohio EPA
district office or local air agency in writing that the batch process train is
subject to this rule. The notification, which shall
be submitted not later than July 26, 2005, shall provide
providing the information specified in paragraph
(K)(5)
(K)(7)
of this rule.
(2) The owner or
operator of a facility that is subject to this rule,
is located in Butler, Clermont, Hamilton, or Warren county
pursuant to paragraph (A)(1)(a) of this rule, and
has an initial startup of a batch process train on or after May 27, 2005, shall
notify the appropriate Ohio EPA district office or local air agency in writing
that the batch process train is subject to this rule. The notification, which shall be submitted not
later than either the date of initial startup of the facility or July 26,
2006,
(
whichever is later),
shall provide
providing the information specified in paragraph
(K)(5)
(K)(7)
of this rule. The application for an installation permit under rule 3745-31-02
of the Administrative Code may be used to fulfill the notification requirements
of this paragraph.
(3) The owner or
operator of a facility that is subject to this rule,
is located in Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, or
Summit county
pursuant to paragraph (A)(1)(b)
of this rule, and has an initial startup of a batch process train before
August 25, 2008 shall notify the appropriate Ohio EPA district office or local
air agency in writing that the batch process train is subject to this
rule. The notification, which shall be
submitted not later than October 24, 2008, shall provide
providing the information specified in paragraph
(K)(5)
(K)(7)
of this rule.
(4) The owner or
operator of a facility that is subject to this rule,
is located in Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, or
Summit county
pursuant to paragraph (A)(1)(b)
of this rule, and has an initial startup of a batch process train on or
after August 25, 2008, shall notify the appropriate Ohio EPA district office or
local air agency in writing that the batch process train is subject to this
rule. The notification, which shall be
submitted not later than either the date of initial startup of the
facility or October 24, 2008,
( whichever is later), shall
provide
providing the information
specified in paragraph (K)(5)
(K)(7) of this rule. The application for an
installation permit under rule 3745-31-02 of the Administrative Code may be
used to fulfill the notification requirements of this paragraph.
(5)
The owner or
operator of a facility that is subject to this rule pursuant to paragraph
(A)(1)(c) of this rule, and has an initial startup of a batch process train
before the effective date of this rule shall notify the appropriate Ohio EPA
district office or local air agency in writing that the batch process train is
subject to this rule not later than sixty days after the effective date of this
rule, providing the information specified in paragraph (K)(7) of this
rule.
(6)
The owner or operator of a facility that is subject to
this rule pursuant to paragraph (A)(1)(c) of this rule, and has an initial
startup of a batch process train on or after the effective date of this rule,
shall notify the appropriate Ohio EPA district office or local air agency in
writing that the batch process train is subject to this rule not later than
either the date of initial startup of the facility or sixty days after the
effective date of this rule, whichever is later, providing the information
specified in paragraph (K)(7) of this rule. The application for an installation
permit under rule 3745-31-02 of the Administrative Code may be used to fulfill
the notification requirements of this paragraph.
(5)(7)
The notification required in paragraphs (K)(1) to
(K)(4)
(K)(6) of this
rule shall include the following information:
(a) Name and address of the owner or
operator.
(b) Address (i.e.,
physical location) of the facility.
(c) Equipment description and Ohio EPA
application number (if assigned) of any batch process train or unit
operation.
(d) Identification of
the applicable requirements, the means of compliance, and the compliance date
for any batch process train.
(e) An
application for an operating permit or an application for a modification to an
operating permit in accordance with Chapter 3745-77 of the Administrative Code
(for sources subject to the Title V permit program) or an application for a
permit-to-install and operate or an application for a modification to a
permit-to-install and operate in accordance with Chapter 3745-31 of the
Administrative Code (for sources not subject to the Title V permit program) for
each subject process that meets one of the following:
(i) The process does not possess an effective
operating permit or permit-to-install and operate.
(ii) The process possesses an effective
operating permit or permit-to-install and operate and the owner or operator
cannot certify in writing to the director that such subject process is in
compliance with this rule. An application for an operating permit or
permit-to-install and operate is not required provided the subject process is
operating under an effective permit and certifies compliance. Such
certification shall include all compliance certification requirements under
paragraph (I)(2) of this rule.
[Comment: Applications for sources not subject to Chapter
3745-77 of the Administrative Code, requiring submittal prior to June 30, 2008,
were submitted in accordance with Chapter 3745-35 of the Administrative
Code.]