Ohio Admin. Code 3745-34-40 - Seismic reflection survey requirements for class I wells
(A) A seismic
reflection data survey shall be conducted at each injection site where a class
I injection well is located or is proposed to be located in order to determine
the presence or absence of such geologic faults or fractures as may be
identified by seismic reflection survey data within or near the area around the
well where the formation pressures may be increased due to the operation of the
well.
(B) A new seismic reflection
data survey is not required, if a seismic reflection data survey was conducted
at an injection site in accordance with a work plan approved by the director or
a seismic reflection data survey was conducted at an injection site and the
results were approved in writing by the director.
(C) The owner of a class I injection well
shall re-evaluate the seismic reflection data collected per paragraph (A) or
(B) of this rule, if there is a change in the area of review of an injection
well or if the owner or operator is proposing a new well to be located at the
injection site. The director may require the owner or operator to submit
additional seismic reflection data as may be necessary or appropriate, if the
director determines that the existing data are inadequate to determine the
presence or absence of geologic faults or fractures as may be identified by
seismic reflection survey data within the altered area of review or within the
area of pressure buildup of the new well.
(D) Prior to conducting a seismic reflection
data survey, the owner or operator shall submit for approval by the director, a
work plan detailing the activities and methods to be used to fulfill the
requirements of paragraph (A) of this rule. The activities and methods
described in the plan shall include those used in data acquisition, processing,
interpreting and reporting the seismic reflection data. This work plan shall,
at a minimum, include the following:
(1)
Provisions for data acquisition, processing, and plotting no less than three
seconds of data.
(2) Proposed line
locations and appropriate acquisition and processing parameters for the data.
The survey shall include adequate horizontal data coverage which will image and
properly identify any known or unknown geologic features that may affect the
site, both during operation and post-closure periods of the wells.
(3) Provisions for keeping detailed and dated
field notes and records of all geophysical investigations.
(4) Provisions for headers on final line
plots to indicate the shotpoint ranges of the various energy sources, if
multiple energy sources are utilized within a survey. Any changes in shooting
or processing parameters utilized should be specified within the headers as
well.
(5) Provisions for having
lines plotted at an appropriate vertical scale.
(6) Other additional information determined
necessary by the director.
(E) The owner or operator shall conduct the
seismic reflection survey per the plan approved by the director under paragraph
(D) of this rule, unless during the conducting of the seismic reflection survey
unanticipated conditions cause a reasonable deviation from the approved plan.
Any deviation from the plan shall be reported to Ohio EPA within one business
day of the deviation taking place. Any deviations from the approved plan shall
continue to allow the resulting seismic reflection survey to meet the
requirements of paragraph (A) of this rule. All deviations from the approved
plan shall be listed within the report required by paragraph (F) of this rule
with an explanation as to why the deviation was necessary and how the deviation
continued to allow the seismic reflection survey to continue to meet the
requirements of paragraph (A) of this rule.
(F) The owner shall submit to the director
four copies of the
a final report and digital data with all appropriate
header information detailing the results of the seismic reflection data survey
required by paragraph (A) of this rule. This report shall be submitted with the
permit to drill application required by rules
3745-34-12 and
3745-34-13 of the Administrative
Code. The report shall be certified in accordance with rule
3745-34-17 of the Administrative
Code. The report shall describe, where present, the faults and fractures within
or near the area around the well where the formation pressures may be increased
due to the operation of the well. Where there are no faults and fractures
present within or near the area around the well where the formation pressures
may be increased due to the operation of the well, the report shall state this.
The report shall, at a minimum, include the following:
(1) A copy of the seismic reflection field
digital data. The field digital data shall be submitted in a format approved by
the director within the work plan required.
(2) A surveyed base map illustrating the
following:
(a) Surveyed line locations with
shot points annotated.
(b) All
wells in the area that penetrate the confining zone, with permit numbers, total
depth and standard symbols utilized to denote these wells. The producing
zone(s) of these wells should be listed within the final report.
(c) The facility property
boundaries.
(d) County and township
boundaries and names (or numbers).
(e) Highways, pipelines, railways and
transmission lines.
(3)
Provisions for including processed digital data of seismic profiles in the
final report.
(a) Brute stack.
(b) Structure stack.
(c) Migration stack.
(4) The compilation and presentation of
processing step notes with the data. These notes should be detailed so the
entire processing sequence may be duplicated by an outside party. Intermediate
data, specific procedures and the technical basis for selected procedures
applied in all static corrections should be provided in digital form.
(5) A copy of interpreted profile sections as
requested by the director with all significant geologic horizons annotated. The
stratigraphic nomenclature shall be that currently in use by the Ohio
department of natural resources, division of geologic survey. Wellbores shall
be projected along regional geologic strike and annotated on nearby sections.
The distance and azimuth of the projection shall be noted on any seismic lines
for each well location. One copy of the uninterpreted seismic sections shall be
included within the report.
(6)
Other additional information determined necessary by the director.
(G) The director may require a
passive seismic monitoring program be maintained at or near the injection site
if the director determines that the operation of a class I injection well may
cause seismic disturbances. The director may require that a microseismicity
monitoring program be maintained at an injection site when determined to be
necessary or appropriate.
Notes
Promulgated Under: 119.03
Statutory Authority: 6111.043
Rule Amplifies: 6111.043
Prior Effective Dates: 03/11/2002, 04/23/2009, 11/11/2016, 03/01/2022
Promulgated Under: 119.03
Statutory Authority: 6111.043
Rule Amplifies: 6111.043
Prior Effective Dates: 03/11/2002, 04/23/2009, 11/11/2016