Ohio Admin. Code 4123:1-3-02 - [Effective until 6/30/2025] Temporary storage and disposal
(A) Reserved.
(B) Reserved.
(C) Temporary storage.
(1) All materials stored in tiers shall be
stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding,
falling or collapse.
(2) Material
stored inside buildings under construction shall not be placed within six feet
of any hoistway or inside floor openings, nor within ten feet of an exterior
wall which does not extend above the top of the material stored.
(3) Bagged materials shall be stacked by
stepping back the layers and cross-keying the bags at least every ten bags
high.
(4) Lumber piles shall not
exceed twenty feet in height provided that lumber to be handled manually shall
not be stacked more than sixteen feet high.
(5) Structural steel, poles, pipe, bar stock,
and other cylindrical materials, unless racked, shall be stacked and blocked so
as to prevent spreading or tilting.
(D) Disposal.
(1) During the course of construction,
alteration, or repairs, form and scrap lumber with protruding nails, and all
other debris shall be kept cleared from work areas, passageways, and stairs, in
and around buildings or other structures.
(2) Containers shall be provided for the
collection of waste, trash, oily and used rags, and other refuse. Containers
used for oily, flammable, or hazardous wastes, such as caustics, acids, harmful
dusts, etc., shall be equipped with covers.
Notes
Promulgated Under: 119.03
Statutory Authority: 4121.12, 4121.121, 4121.13, Const. Art. II, Sec. 35
Rule Amplifies: 4121.47
Prior Effective Dates: 11/01/1979
Promulgated Under: 119.03
Statutory Authority: 4121.12, 4121.121, 4121.13, Ohio Const. Art. II, Sec. 35
Rule Amplifies: 4121.47
Prior Effective Dates: 11/1/79
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
(A) Reserved.
(B) Reserved.
(C) Temporary storage.
(1) All materials stored in tiers shall be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse.
(2) Material stored inside buildings under construction shall not be placed within six feet of any hoistway or inside floor openings, nor within ten feet of an exterior wall which does not extend above the top of the material stored.
(3) Bagged materials shall be stacked by stepping back the layers and cross-keying the bags at least every ten bags high.
(4) Lumber piles shall not exceed twenty feet in height provided that lumber to be handled manually shall not be stacked more than sixteen feet high.
(5) Structural steel, poles, pipe, bar stock, and other cylindrical materials, unless racked, shall be stacked and blocked so as to prevent spreading or tilting.
(D) Disposal.
(1) During the course of construction , alteration, or repairs, form and scrap lumber with protruding nails, and all other debris shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures.
(2) Containers shall be provided for the collection of waste, trash, oily and used rags, and other refuse. Containers used for oily, flammable, or hazardous wastes, such as caustics, acids, harmful dusts, etc., shall be equipped with covers.
Notes
Promulgated Under: 119.03
Statutory Authority: 4121.12, 4121.121, 4121.13, Const. Art. II, Sec. 35
Rule Amplifies: 4121.47
Prior Effective Dates: 11/01/1979
Promulgated Under: 119.03
Statutory Authority: 4121.12, 4121.121, 4121.13, Ohio Const. Art. II, Sec. 35
Rule Amplifies: 4121.47
Prior Effective Dates: 11/1/79