Ohio Admin. Code 4123:1-5-26 - Trenches and excavations
(A) General requirements
specifications.
(1)
Utility companies and municipally owned utilities shall
will be
contacted and advised of proposed work prior to the start of actual excavation.
Prior to opening an excavation, effort shall
will be made to
determine whether underground installations, i.e., sewer, telephone, water,
fuel, electric lines, etc., will be encountered and, if so, where such
underground installations are located.
(2) An employee shall
will not be
required to use mechanical digging or trenching equipment within three feet of
an energized underground electrical conductor whose location is known, unless
the conductors are protected by concrete ducts or equivalent
protection.
(3) Where trenches or
excavations are made in locations adjacent to backfilled trenches or
excavations or where trenches or excavations are subjected to vibrations from
any source, such as railroad or highway traffic or the operation of machinery,
additional precautions by way of shoring and bracing shall
will be taken to
prevent slides or cave-ins.
(4)
Undercutting of the exposed faces of trenches or excavations is
prohibited
not
permitted unless the exposed faces of such undercutting are supported by
one or more of the methods prescribed for the support of exposed faces of
trenches.
(5) Material placement.
(a) Excavated material or other material
shall
will be
retained a minimum of twenty-four inches from the top edge of the trench or
excavation.
(b) As an alternative
to the clearance prescribed in paragraph (A)(5)(a) of this rule, the employer
shall
will use
effective barriers or other effective retaining devices in lieu thereof in
order to prevent excavated or other materials from falling into the trench or
excavation.
(6) Wells,
pits, shafts etc.
(a) All wells, pits, shafts,
etc., shall
will be barricaded or covered.
(b) Upon completion of exploration and
similar operations, temporary wells, pits, shafts, etc.,
shall
will be
backfilled.
(B)
Trenches.
(1) The exposed faces of all
trenches more than five feet high shall
will be shored, laid back to a stable slope, or
some other equivalent means of protection shall
will be
provided where employees may be exposed to moving ground or caveins. (See table
26-1 to this rule.)
(2) Sides of
trenches in unstable or soft material, five feet or more in depth,
shall
will be
shored, sheeted, braced, sloped, or otherwise supported by means of sufficient
strength to protect the employees working within them. (See table 26-1 and
table 26-2 to this rule.)
(3) Sides
of trenches in hard compact soil, including embankments,
shall
will be
shored or otherwise supported when the trench is more than five feet in depth
and eight feet or more in length. In lieu of shoring, the sides of the trench
above the five-foot level may be sloped to preclude collapse, but
shall
will
not be steeper than a one-foot rise to each one-half-foot horizontal.
(4) Materials used for sheeting and sheet
piling, bracing, shoring, and underpinning, shall
will be in good
serviceable condition, and timbers used shall
will be sound
and free from large or loose knots, and shall
will be designed
and installed so as to be effective to the bottom of the trench.
(5) Minimum requirements
specifications - trench shoring.
(a) Minimum requirements
specifications for trench bracing and shoring
shall
will be
in accordance with table 26-2 to this rule. The vertical planks in the bracing
system shall
will extend at least to the top of the trench
face.
(b) Braces and diagonal
shores in a wood shoring system shall
will not be subjected to compressive stress in excess
of values given by the following formula:
S = 1300 - 20L ÷ D
Maximum ratio: L ÷ D = 50
Where: L = length, unsupported, in inches.
D = least side of the timber in inches.
S = allowable stress in pounds per square inch of cross section.
(6) When
employees are required to be
working in trenches four feet deep or more, an
adequate means of exit, such as a ladder or steps, shall
will be provided
and located so as to require no more than twenty-five feet of lateral
travel.
(7) When bracing or shoring
of trenches is required
needed, such bracing and shoring
shall
will be
carried along with the excavation.
(8) Cross braces or trench jacks
shall
will be
placed in true horizontal position, be spaced vertically, and be secured to
prevent sliding, falling, or kickouts.
(9) Portable trench boxes, safety cages or
sliding trench shields may be used for the protection of employees in lieu of a
shoring system or sloping. Where such trench boxes or shields are used, they
shall
will be
designed, constructed, and maintained in a manner which will provide protection
equal to or greater than the sheeting or shoring required
needed for
the trench and shall
will extend at least to the top of the trench
face.
(10) Backfilling and removal
of trench supports shall
will progress together from the bottom of the trench.
Jacks or braces shall
will be released slowly, and, in unstable soil,
employees shall
will clear the trench before pulling out the jacks or
braces with ropes.
(C)
Excavations.
(1) The walls and faces of all
excavations in which employees are exposed to danger from moving ground
shall
will be
guarded by a shoring system, sloping of the ground, or some other equivalent
means. (See table 26-1 and table 26-2 to this rule.)
Table 26-1.
Click to view image
Click to view image
(2)
Supporting systems, i.e., piling, cribbing, shoring etc., shall be designed by
a qualified person and shall meet accepted engineering
requirements
specifications.
(3) Excavations sloped to the angle of repose
shall
will be
flattened when an excavation has water conditions, silty materials, loose
boulders, and areas where erosion, deep frost action, and slide planes
appear.
(4) Sides, slopes, and
faces of all excavations shall
will meet accepted engineering
requirements
specifications by scaling, benching, barricading, rock
bolting, wire meshing, or equally effective means.
(5) Materials used for sheeting, sheet
piling, cribbing, bracing, shoring, and underpinning shall
will be in good
serviceable condition, and timbers shall
will be sound,
free from large or loose knots, and of proper dimensions. (See table 26-2 to
this rule for proper dimensions.)
(6) Excavations below the level of the base
of the footing of any foundation or retaining wall are
prohibited
not
permitted, except in hard rock, unless the wall is underpinned and
appropriate precautions are taken to ensure the stability of adjacent
walls.
(7) If it is necessary to
place or operate power shovels, derricks, trucks, materials, or other heavy
objects on a level above and near an excavation, the side of the excavation
shall
will be
sheet-piled, shored, braced or sloped as necessary to resist the extra pressure
due to such super-imposed loads.
(8) When mobile equipment is utilized or
allowed adjacent to excavations, substantial stop logs or barricades
shall
will be
installed.
(9) Where employees or
equipment are required to cross over
excavations, walkways or bridges with standard guardrails
shall
will be
provided.
Notes
Promulgated Under: 119.03
Statutory Authority: 4121.12, 4121.121, 4121.13
Rule Amplifies: 4121.47
Prior Effective Dates: 01/01/1986, 04/10/2011, 06/01/2016
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.