Ohio Admin. Code 4901:5-19-01 - Definitions
As used in this chapter:
(A) "Commission" means the public utilities
commission of Ohio.
(B) "Consumer"
means a person who consumes electric energy.
(C) "Electric power producer" means a person,
municipality, or governmental or political subdivision, located in this state
and engaged in the business of generating electricity for lighting, heat, or
power purposes.
(D) "Electric
provider" means any:
(1) Electric distribution
utility, as defined in division (A) of section
4928.01 of the Revised
Code.
(2) Municipal electric
utility, as defined in division (A) of section
4928.01 of the Revised
Code.
(3) Electric cooperative, as
defined in division (A) of section
4928.01 of the Revised
Code.
(4) Electric services
company, as defined in division (A) of section
4928.01 of the Revised Code,
that is subject to certification under section
4928.08 of the Revised
Code.
(E) "Energy
emergency" means:
(1) The governor has filed
a written declaration of an energy emergency pursuant to section
4935.03 of the Revised Code,
having found that the health, safety, or welfare of the residents of this state
or of one or more counties of this state is so imminently and substantially
threatened by an energy shortage with regard to the supply of fuel for electric
power generation that immediate action of state government is necessary to
prevent loss of life, protect the public health or safety, and prevent
unnecessary or avoidable damage to property.
; and
(2) Such written declaration is in effect and
has not been terminated.
(F) "Fuel source advisory council" means the
advisory group formed by the chairperson of the commission to monitor and
advise the commission concerning fuel supply or energy shortages and related
matters.
(G) "Nonpriority use"
means all use of electricity other than priority use.
(H) "Normal usage" means
the level of electric energy consumption during
the comparable period during the previous year, adjusted for weather or other
major changes in usage.
(I)
"Person" means an individual, corporation, business trust, estate, trust,
partnership, state or federal agency, or association.
(J) "Priority use" means the minimum amount
of electric energy necessary for protection of the public's health and safety,
and for prevention of unnecessary or avoidable damage to:
(1) Residences (including, but not limited
to, homes, apartments, nursing homes, institutions, and facilities for
permanent residents or transients).
(2) Hospitals.
(3) Medical and human life-support systems
and facilities.
(4) Electric power
generating facilities and central heating plants serving the public.
(5) Telephone, radio, television, and
newspaper facilities.
(6) Local and
suburban transit systems and air terminal facilities.
(7) Police and firefighting facilities,
emergency management and response facilities, military bases, federal
facilities essential to national defense, and Ohio national guard
facilities.
(8) Water supply and
pumping facilities.
(9) Sanitary
service facilities for collection, treatment, or disposal of community
sewage.
(10) Production facilities
for natural gas, artificial or synthetic gas, propane, and petroleum fuels, and
fuel refineries.
(11) Pipeline
transmission and distribution facilities for natural gas, artificial or
synthetic gas, propane, and petroleum fuels.
(12) Coal mines and related
facilities.
(13) Production,
processing, distribution, and storage facilities for perishable medicines and
medical supplies, dairy products, meat, fish, poultry, eggs, produce, grain,
breads, and livestock and poultry feed.
(14) Buildings and facilities, limited to
protecting the physical plant and structure, appurtenances, equipment, product
inventories, raw materials, livestock, and other real or personal
property.
(15) Such other similar
facilities as may be determined by the commission to be a priority
use.
Notes
Promulgated Under: 111.15
Statutory Authority: 4935.03
Rule Amplifies: 4935.03
Prior Effective Dates: 06/24/1978, 02/01/1980, 07/02/1982, 04/16/1987, 02/22/2010, 11/04/2012, 02/15/2018
Promulgated Under: 111.15
Statutory Authority: 4935.03
Rule Amplifies: 4935.03
Prior Effective Dates: 06/24/1978, 02/01/1980, 07/02/1982, 04/16/1987, 02/22/2010, 11/04/2012
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.