Ohio Admin. Code 901:10-4-01 - General permit to operate
(c) The facilities are regulated by
a NPDES permit and have similar discharge characteristics and require the same
operating conditions to meet either effluent limitations or water quality
standards.
(1) Construction stormwater
sources;
(2) Any concentrated animal feeding
facility that requires NPDES permit coverage as a concentrated animal feeding
operation and is not a major concentrated animal feeding
facility;
(2) The director may modify,
suspend, or revoke eligibility for or coverage under a NPDES general permit to
operate for the criteria set forth in paragraphs (E)(1) of this rule or in the
following situations:
(a) The discharging facility is not
in compliance with the conditions of the general NPDES permit;
(b) New discharges which are not
discharges currently covered by a NPDES general or individual permit. A general
NPDES permit to operate will not be issued for new discharges associated with
concentrated animal feeding facilities requiring a NPDES permit if the
receiving waters are designated as outstanding national resource waters,
outstanding high quality waters, superior high quality waters, or state
resource waters, or to receiving waters that discharge to a water with one of
these designations within two stream miles of the discharge
point;
(c) A discharge exists and is a
significant contributor of pollutants. The director may consider the following
factors:
(i) Location of discharge with
respect to waters of the State;
(ii) Size of discharge;
and
(iii) Quantity and nature of
pollutants discharged; or other relevant factors.
(d) Conditions at the permitted
NPDES operation change, altering the constituents or characteristics of the
discharge such that the discharge no longer qualifies for coverage under a
general permit;
(e) Circumstances have changed since
the time of the request to be covered so that the discharger is no longer
appropriately controlled under the general NPDES permit or either a temporary
or permanent reduction or elimination of the authorized discharge is
necessary;
(f) A change has occurred in the
availability of demonstrated technology or practices for the control or
abatement of effluent or effluent limitations are promulgated for the facility
covered by the general permit;
(g) A determination has been made
that the waters are not meeting applicable water quality standards; or and
approved water quality management plan; or
(h) Effluent limitation guidelines
are promulgated for point sources covered by the general NPDES
permit.
(3) The director may require any
discharging facility authorized by a NPDES general permit to operate to apply
for and obtain an individual NPDES permit to operate. Any interested person may
petition the director to take action under this paragraph. Cases where an
individual NPDES permit to operate may be required shall be as set forth in the
criteria of paragraph (E)(2) of this rule.
(F) Each general NPDES permit to
operate for NPDES operations must be approved by the United States
environmental protection agency before the permit becomes
effective.
Notes
Promulgated Under: 119.03
Statutory Authority: 903.08, 903.10
Rule Amplifies: 903.01, 903.08, 903.09, 903.10
Prior Effective Dates: 07/02/2002, 09/15/2005, 05/07/2017