Okla. Admin. Code § 252:515-13-35 - Construction report

(a) Report required. A final construction report of the leachate collection system shall be submitted to the DEQ.
(b) Report details. The construction report shall include:
(1) invert elevations to the nearest 0.01 foot at least every 25 feet along each collection pipe, changes in grade, and at all connections to structures.
(2) a map showing the locations of system components tied to at least two permanent monuments;
(3) the results of storage tank leak detection tests, if applicable;
(4) any deviations from the approved construction plan made necessary by changes of circumstances;
(5) the method for phased tie-in of leachate collection pipes;
(6) the date and results of the first cleanout of the collection pipes; and
(7) as constructed drawings, calculations and other pertinent data to demonstrate compliance with this Part.
(c) DEQ approval required. The construction report shall be approved by the DEQ before the placement of waste.

Notes

Okla. Admin. Code § 252:515-13-35
Added at 20 Ok Reg 1151, eff 6-1-03

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.