Okla. Admin. Code § 252:515-3-55 - Existing contour map

(a) Required map. The permit application shall include a constructed map showing the topographic contours prior to any operations at the facility.
(b) Contour intervals. The contour interval on the map shall not be greater than two feet.
(c) Required details. The existing contour map shall show the location and quantities of surface drainage entering and exiting the facility, and the locations of all boreholes with their surface elevations.

Notes

Okla. Admin. Code § 252:515-3-55
Added at 20 Ok Reg 1151, eff 6-1-03

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.